2023-08-03   EV Chargers for EPA (Environmental Protection Agency)
Electric Vehicle Chargers, with a suitable back office solution. View the procurement ยป
2023-06-29   EV Chargers for EPA (Environmental Protection Agency)
Electric Vehicle Chargers, with a suitable back office solution. View the procurement ยป
2021-12-21   supply and installation of Solar Photovoltaic ( PV) Panels (Lot 1)and Electric Vehicles (EV) Chargers(Lot 2) (Inland Fisheries Ireland)
supply and installation of Solar Photovoltaic ( PV) Panels (Lot 1)and Electric Vehicles (EV) Chargers(Lot 2) View the procurement ยป
Mentioned suppliers: Heverin Renewable Energies
2021-10-11   Requirement for Temporary Emergency Generation - 200MW (EirGrid plc)
The CRU, with the consent of the Minister for the Environment, Climate and Communications, has directed EirGrid under Regulation 28(10) of the Regulations, in our capacity as the transmission system operator, to secure the delivery of c. 200MW of emergency temporary generation from 2022 EirGrid is therefore seeking a Candidate(s) that can provide 200 MW of generation onto the transmission network by a target date of Q3 2022. (The provision of the fully operational generation is required for 3 years from โ€ฆ View the procurement ยป
Mentioned suppliers: ESB Generation & Wholesale Markets Huntstown Power Company Limited
2021-03-15   Control and Instrumentation Maintenance Resources Framework (Electricity Supply Board (ESB))
Control and instrumentation maintenance resources framework for ESB generating stations. The work to be carried out is the provision of Instrumentation contractor resources for ongoing instrumentation maintenance at ESB Generating Stations. A substantial amount of additional work may be in progress by other contractors at the same time therefore the contractor will be expected to undertake and commit to working closely with the engineer, whose approval will be required for access to specific work areas. โ€ฆ View the procurement ยป
2020-06-16   Turnkey Delivery of High Voltage Electrical Substations in the Republic of Ireland Pursuant to a... (Electricity Supply Board (ESB))
The contracting entity intends to procure a multi-supplier/contractor framework agreement for the turnkey delivery of high voltage substations in the Republic of Ireland. Refer to section A.1.1 of the PQQ for a general description of the proposed scope of the framework. View the procurement ยป
Mentioned suppliers: ABB Power Grids Ireland Limited H&MV Engineering Ltd Linxon UK Limited Mace Technology [Ireland] Limited... Siemens Energy Ltd Siemens Energy Ltd (Consortium Lead) &... Suir Engineering Ltd
2016-01-29   16/020 โ€” Request for Demand Side Unit Aggregators (Ervia)
Irish Water seeks requests to participate from DSU Aggregators in a tender to enable Irish Water to partake in the demand side response scheme as offered by Eirgrid. View the procurement ยป
2013-12-20   FD/02/05/292 - Facilities Management Services (Irish Prison Service)
The Irish Prison Service (IPS) requires the provision of a facilities management contract covering Mechanical and Electrical planned and reactive maintenance. Service provider must provide a fully managed service, acting as a Prime Contractor with single point responsibility for managing and delivering all the services at the specified premises. The scope of the contract shall be to provide a facilities management service for the provision of specialist contractor support with a managed service to cover โ€ฆ View the procurement ยป
2012-11-01   LIT Framework Agreements for the Provision of Electrical Maintenance Services (Limerick Institute of Technology)
LIT is issuing this contract notice inviting expressions of interest as the first stage of a two-stage process for appointment to three single-party framework agreements (โ€œthe Framework Agreementsโ€) as follows: Lot 1 Call Out Electrical Maintenance & Attendance Works โ€“ LIT Limerick. Lot 2 Call Out Electrical Maintenance Works โ€“ LIT Thurles. Lot 3 Call Out Electrical Maintenance Works โ€“ LIT Clonmel. The purpose of the first stage is to obtain information from the applicants to determine their suitability โ€ฆ View the procurement ยป
2011-01-19   Garracummer 38 kV cable, electrical & civil power distribution works, Hollyford, Co. Tipperary (Garracummer Wind Farm Limited (company number 383356 and registered office Gasworks Road))
The proposed contestable 38 kV cable works (electrical (incl. fibre optic cable) & civil) is associated with the Garracummer (37.9 MW) and Hollyford (9 MW) wind farms located near the village of Hollyford Co. Tipperary. As per their respective connection agreements these wind farms connect into the proposed Multeen 38/20 kV substation on the Garracummer wind farm site, which in turn connects into the transmission network via approx 17.5 km of 38 kV cable to a looped 110/38 kV substation (presently under โ€ฆ View the procurement ยป
Mentioned suppliers: Denis Moriarty The Kerries Limited