2023-08-28National Aquatic Centre AquaZone Pool Area and Changing Rooms Wet Pour Rubber Tiling and Maintenance (Sport Ireland Facilities DAC)
The works forming the subject matter of this contract involves the laying of Rubber Flooring in AquaZone and AquaZone Changing Rooms at the National Aquatic Centre, which is situated on the Sport Ireland Campus, Blanchardstown, Dublin 15. The works will involve preparing the current flooring for the Wet Pour Rubber Flooring including repairs to tiles, removing current rubber flooring, disposing of flooring, preparing the area for rubber flooring, installing the rubber flooring, training staff in …
View the procurement »
2023-08-21Maintenance Services (Registration Code CV1001) (Circle Voluntary Housing Association CLG)
Circle Voluntary are inviting tenders in respect of Periodic Servicing, Inspections, Routine and Responsive Maintenance including Out of Hours Emergency Callouts, Void Property Works, Major Works and Technical Inspections to their housing stock.
The housing stock is located in Dublin City and the Counties of Clare, Cork, Dun Laoghaire-Rathdown, Fingal, Kildare, Limerick, Louth, Meath, South Dublin, Tipperary, Waterford, Wexford and Wicklow
View the procurement »
2022-10-06Main Contractor Works Package for Trinity College Dublin, the University of Dublin (Trinity College Dublin, the University of Dublin)
Trinity College Dublin, the University of Dublin invites suitably qualified works contractors to pre-qualify for the Works Contract (including other services) for the Old Library Redevelopment Project (OLRP). The project concerns the construction works located at the University’s city centre campus. The contracting Authority intends to invite 6 candidates to tender, please note that the contracting authority reserves the right to invite at least 6, subject to the number qualifying.
View the procurement »
2019-09-06Samuel Beckett Civic Campus Phase 2: Pool Tiling (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
A. The change of use of the Phase 1 sports and community building to a library and community building;
B. Refurbishment of the existing sports building to create a new library;
C. The construction of a new sports building, incorporating a 25 m swimming pool, a children’s …
View the procurement »
2019-09-06Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
(a) the change of use of the Phase 1 sports and community building to a library and community building;
(b) refurbishment of the existing sports building to create a new library;
(c) the construction of a new sports building, incorporating a 25 metre swimming pool, a …
View the procurement »
2019-02-25Redevelopment Works at Westland Row, Dublin 2 (Royal Irish Academy of Music)
The RIAM are redeveloping their property to the rear of the existing premises at 36–38 Westland Row, Dublin 2. The re-development project is to the rear of an existing protected structure which is also within the ownership of the RIAM.
The development will consist of the upgrading and extension of the existing Royal Irish Academy of Music's facilities from c. 4 039 sqm to c. 6 070 sqm. The development will comprise:
Demolition of existing modern extensions (with a combined area of c. 2 363 sqm) to the …
View the procurement »
2018-11-30Specialist Office Fit-out Works for Science Foundation Ireland at Three Park Place, Upper Hatch St, Dublin 2 (Science Foundation Ireland)
The proposed works will comprise the fit-out of circa 2 200 m net (on the 4 and 5 floors) in Three Park Place, Hatch Street, Dublin 2 for office accommodation. The fit out works will consist of open plan office space, cellular offices, meeting rooms, training rooms, canteen area, storage areas, services areas and ancillary office accommodation areas.
The main building works (shell and core and CAT A works) are complete. The works are to be completed by mid August 2019 to allow occupation by SFI in …
View the procurement »
2017-02-20Bathroom Pods in 3 phases (University College Dublin (UCD))
UCD wishes to establish a multi party framework agreement with competent organisations for the design, manufacture, supply and delivery of pre-fabricated, pre-cast concrete frame Bathroom Pods for Student Accommodation. The works for the overall Framework will comprise approximately 3 000 Bathroom Pods. Phase 1 is to include for approximately 920 bathroom pods, with approximately 1 250 in Phase 2 and 830 in Phase 3.
View the procurement »