2022-05-06Block C Tools and Hydrogen Generator Project at Tyndall National Institute for University College Cork (University College Cork ( UCC ))
UCC hereby issues this information in accordance with the requirements of EC directive 2004/18/EEC (open procedure) to establish a Single Supplier Framework for Equipment Hook Up/Process Installations at Tyndall National Institute, and to procure a works contract for the “Block C Tools and Hydrogen Generator Project”. This initial contract involves the replacement of two free-issue process tools within the Block C Cleanroom, the installation of a free-issue Hydrogen Generator module on the roof of Block …
View the procurement » Mentioned suppliers:L.Lynch & Co.Ltd
2022-04-07Louth County Council - FASTER Project Market Soundings (Louth County Council)
The FASTER project is a joint cross border project across Scotland, the border Counties of Ireland and Northern Ireland to support the overarching ambition to transition to low carbon transport systems and to demonstrate how each of the three jurisdictions can provide early systems learning in relation to the electrification of transport.
View the procurement »
2022-03-29Kilbride School Campus Electrical Works (Kildare and Wicklow Education and Training Board)
Expressions of Interest are invited from suitably qualified Electrical Contractors who wish to be considered for the construction of a new educational campus and a new link road that will serve the school campus which will include the provision of two school buildings. Gaelscoil an Inbhir Mhóir a two-storey, 16 classrooms primary school with special needs rooms. Gaelchólaiste na Mara a three-story, post primary school with special needs rooms. Proposed site works to include the construction of new hard …
View the procurement »
2022-01-18Mechanical & Electrical Engineer Services for Additional Accomodation at Scoil ChaitlĂn Maude (Scoil Chaitlin Maude)
Scoil Chaitɨn Maude is a primary school under the patronage of An Foras Pátrúnachta
Please see attached Project Brief & Schedule of Additional Accommodation
In summary, the project will comprise
Section A:
• Central Activiies Space 80 m2
• Classroom safe base 70m2
• Classroom safe Base 70m2
• Toilets and shower area 20m2
• Quiet Space 1 12m2
• Quiet Space 2 12m2
• Multi Activity Room 20m2
• Daily living skills 15m2
• Staff Toilets 10.0 m2
• Storage 25m2
• Cleaner store / linen / …
View the procurement »
2022-01-17Powered Gates and Shutters (Iarnrod Eireann-Irish Rail)
Iarnród Éireann requires the services of a suitably qualified contractor to undertake maintenance, repairs and replacement works on existing Powered Gates, Shutters, Doors and Barriers. The requirements under this contract will include; planned preventative maintenance, unplanned repair works, installation of new and certificate submissions to IE Sharepoint document library.
View the procurement »
2021-10-11Requirement for Temporary Emergency Generation - 200MW (EirGrid plc)
The CRU, with the consent of the Minister for the Environment, Climate and Communications, has directed EirGrid under Regulation 28(10) of the Regulations, in our capacity as the transmission system operator, to secure the delivery of c. 200MW of emergency temporary generation from 2022
EirGrid is therefore seeking a Candidate(s) that can provide 200 MW of generation onto the transmission network by a target date of Q3 2022. (The provision of the fully operational generation is required for 3 years from …
View the procurement » Mentioned suppliers:ESB Generation & Wholesale MarketsHuntstown Power Company Limited