2018-11-19Soliciting Interest to Invest in Coillte's Bio Energy Opportunity (Coillte CGA)
Coillte is inviting potential investors to bring forward proposals for a 50:50 co-development partnership (as outlined in the summary document attached) to participate in this opportunity, and to fully develop the proposal with Coillte through inception and development of the full proposal, and subject to agreement by all parties the delivery and operation of the proposal.
Please find attached a summary document which provides further details of the opportunity.
Coillte intends to use a competitive …
View the procurement »
2017-02-21Stillorgan Reservoir (Irish Water)
Stillorgan Reservoir is a modular storage facility for treated drinking water, built in 2 stages between 1862 and 1885. The site has a total plan area of approximately 16 hectares and is subdivided into 3 discrete water storage reservoirs, the Gray, Upper and Lower Reservoirs. The Lower and Upper reservoirs were constructed first, as part of the Vartry Water Supply Scheme. The Gray Reservoir was built in 1885 following a period of severe water shortage in Dublin City. The reservoirs originally contained …
View the procurement » Mentioned suppliers:J Murphy and Sons Ltd
2016-10-07Vartry Water Supply Project — Vartry to Callowhill Link Contract (Irish Water)
As part of the Vartry Water Supply Project — Water to Callowhill Link Contract, Irish Water plan to replace the existing Vartry to Callowhill Tunnel and Callowhill BPT with a high lift pumping station, 4 km pipeline, summit BPT and energy recovery turbine / BPT at Callowhill.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design and …
View the procurement » Mentioned suppliers:Roadbridge
2015-05-06Civil Works Balance of Plant for Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Cullenagh wind farm project.
Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2015-04-27Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionnaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2015-03-20Thermal Energy Efficiency Project (Irish Prison Service)
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33 % by 2020.
To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project …
View the procurement »
2014-12-03Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire.
Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions.
View the procurement »
2014-08-14PG108T926 Knottingley power CCGT development (Knottingley Power Limited)
The combined cycle gas turbine power station, to be constructed east of Knottingley, West Yorkshire, UK, will consist of up to 3 separate single shaft generating units, hybrid cooling towers and other ancillary structures and will have a nominal net electrical output capacity of no more than 1 500 MWe at ISO conditions. The power station will be gas fired and served by an 8 km long underground gas pipeline connecting the power station to the National Grid Transmission System south of the town of …
View the procurement »
2014-03-28Civil Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre-qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2014-03-28Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2013-12-12Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project.
Further information is available in the following documents which are attached to this notice:
1. Expression of Interest document.
2. Pre Qualification Questionaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2011-02-28Multi supplier framework for civil contracts relating to Bord Gáis wind farm development (Bord Gais Eireann)
This pre-qualification questionnaire is issued by Bord Gáis Éireann (“the Client”) for the purposes of providing information to applicants interested in applying to pre-qualify and proceed to the tender stage for the procurement of a framework for the provision of certain civil construction works in connection with the development of wind farms by the client (or any subsidiary of the client).
The anticipated scope of civil works applicable to the framework includes but is not limited to the following …
View the procurement »