2021-01-27Supply of Cement for the Manufacture of Concrete Sleepers (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) invites applications from suitably qualified companies to apply for the proposed tender for the Supply and Delivery of the following to its concrete sleeper factory in Portlaoise, Co. Laois:
1) Rapid Hardening Portland Cement — EN197-1 CEM I 42.5R Bulk Delivery;
2) Normal type Cement — EN197-1 CEM II/A-L 32,5N 80 x 25 kg Pallets.
A copy of the specification for cement is also attached to the published eTenders/Ojeu notice.
This would be a 3 years fixed price agreement..
A pre …
View the procurement » Mentioned suppliers:Irish Cement Ltd
2020-10-16Sale of Landfill Ash from Coal Plant (Electricity Supply Board (ESB))
ESB is examining the potential to offer for sale, in excess of 2 million tons of Landfill Ash, from Moneypoint coal-fired power station. It is estimated that the landfill contains at least 200 kT of Furnace Bottom Ash and at least 1.8 million tons of conditioned fly ash for sale, for use in the cement or concrete industry.
Interested parties should note that this selection process is not governed by the provisions of Directive 2004/18/EC or Directive 2004/17/EC (or the Irish regulations transposing those …
View the procurement »
2018-04-12Supply of Cement (Rapid Hardening & Normal) (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) invites applications from suitably qualified companies to participate in the Pre-Qualification process for the proposed tender for the Supply and Delivery of the following cement products to its concrete sleeper factory in Portlaoise, Co. Laois:
1— rapid hardening Portland cement - EN197-1 CEM I 42.5R Bulk Delivery
2— normal cement - EN197-1 CEM II/A-L 32,5N 80 x 25kg Pallets
A copy of the specification for cement is also attached to the published etenders /Ojeu notice.
This would be …
View the procurement » Mentioned suppliers:Irish Cement Ltd
2015-04-16GWM2723 Supply of Cement ESB Moneypoint (ESB)
Electricity Supply Board is the state owned electricity utility in Republic of Ireland. ESB Moneypoint Generating Station requires an ongoing supply of Portland Cement to enable batching of FGD (Flue Gas Desulphurisation) by-product. This Contract Notice is an invitation by ESB for expressions of interest from suitably qualified candidates interested in supplying cement to Moneypoint.
View the procurement » Mentioned suppliers:Irish Cement Limited
2014-10-10Long term contract for the supply of rapid hardening Portland cement (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) invites applications from suitably qualified companies to participate in the Pre-Qualification process for the proposed tender for the supply and delivery of rapid hardening Portland cement to its concrete sleeper factory in Portlaoise, Co. Laois. This will be for a 3 year fixed price period with the option to extend for an additional 2 years.
A Pre-Qualification Questionnaire is available for download and must be completed and returned in order to be considered for tender stage.
View the procurement »
2014-03-14ENQEIR409 - Provision of Local Reserve (EirGrid plc)
The risk of a local shortage of generation adequacy is caused by restrictions on the transmission network. The Northern Ireland Authority for Utility Regulation (NIAUR) has written to SONI requesting it to explore arrangements, such as putting in place relevant System Support Services, to alleviate some or all of the risk identified. NIAUR has noted that any such arrangements should be time limited and that any additional costs of putting in place such measures should be reasonable and proportionate. …
View the procurement »
2013-08-28ENQEIR336 - Short Term Active Response (EirGrid plc)
STAR is an interruptible load type service in Ireland by which electricity consumers agree to have either their entire load or a portion of their load disconnected, without notice, during an under-frequency incident. STAR assists in the recovery of the power system frequency to normal operating conditions following the loss of a major generation in-feed to the power system. The TSO makes payment for the service based on the level of load that an electricity consumer makes available for interruption.