Procurements: Peristaltic pumps
4 archived procurements
Peristaltic pumps have been procured by organizations such as Irish Water, FAS - Foras Aiseanna Saothair,Training and Employment Authority, and University College Cork ( UCC ).
Historically, suppliers within this area have been Astech Ireland Ltd, Avonmore Electrical Co Ltd, Campion Mchncl Electrical Eng. Ltd, Cantwell Electrical Engineering Ltd, Commissioning Services Ltd, Consolidated Pumps Ltd, Drilling and Pumping Supplies Ltd, Electrical & Pump Services Ltd, Enisca Ltd, and Flexachem/Netzsch Manufacturing Ltd.
- Industrial machinery (>20 new procurements)
- Machinery for the production and use of mechanical power (5)
- Pumps and compressors (4)
- Pumps (2)
- Laboratory pumps and accessories
- Peristaltic pumps โฌ ๏ธ
Recent procurements of peristaltic pumps in Ireland
2022-12-15
Supply, Installation and Commissioning of Mixing, Filtration and Filling Equipment for Biopharma Processing for... (University College Cork ( UCC ))
As per RFT View the procurement ยป
As per RFT View the procurement ยป
2019-02-08
Multi Supplier Framework for the Provision of Pumps and Associated Works to Irish Water โ Lots 1 and 2 (Irish Water)
The Multi-Supplier Framework will be established on a national basis and sub-divided into 2 separate lots: Lot 1: The supply and delivery of pumps, parts and accessories to Irish Water. Lot 1 is further divided down into the following sub-lots: (a) wet well submersible pump(s), (b) dry well submersible pumps(s), (c) borehole/well pump(s), (d) macerator pump(s), (e) positive displacement/dosing pump(s), (f) end suction pump(s), (g) multistage and booster. Lot 1: tenderers shall be required to provide โฆ View the procurement ยป
The Multi-Supplier Framework will be established on a national basis and sub-divided into 2 separate lots: Lot 1: The supply and delivery of pumps, parts and accessories to Irish Water. Lot 1 is further divided down into the following sub-lots: (a) wet well submersible pump(s), (b) dry well submersible pumps(s), (c) borehole/well pump(s), (d) macerator pump(s), (e) positive displacement/dosing pump(s), (f) end suction pump(s), (g) multistage and booster. Lot 1: tenderers shall be required to provide โฆ View the procurement ยป
2018-02-14
Multi Supplier Framework for Pumps and Associated Works (Irish Water)
The multi-supplier framework will be established on a national basis and subdivided into 2 separate Lots detailed below: Lot 1: The Supply and Delivery of pumps, parts and accessories to Irish Water, with sublots. Lot 2: The Supply and Installation of pumps, parts and ancillary items for Irish Water with sublots. View the procurement ยป
The multi-supplier framework will be established on a national basis and subdivided into 2 separate Lots detailed below: Lot 1: The Supply and Delivery of pumps, parts and accessories to Irish Water, with sublots. Lot 2: The Supply and Installation of pumps, parts and ancillary items for Irish Water with sublots. View the procurement ยป
2009-08-19
Laboratory furniture (FAS - Foras Aiseanna Saothair,Training and Employment Authority)
Title attributed to the contract by the contracting authority: EOI Procurement of Bio-Pharma / Pharmaceutical Equipment for FรS Cork. The Industrial Development Agency (IDA), in its 2004 annual report, showed a trend in employment in the bio-pharmaceutical industry. At present there are approximately 20 000 persons employed in this sector. These employment figures created a demand for training of quality skilled process operatives and craftspersons. In response to this demand in 2005 FรS decided to โฆ View the procurement ยป
Title attributed to the contract by the contracting authority: EOI Procurement of Bio-Pharma / Pharmaceutical Equipment for FรS Cork. The Industrial Development Agency (IDA), in its 2004 annual report, showed a trend in employment in the bio-pharmaceutical industry. At present there are approximately 20 000 persons employed in this sector. These employment figures created a demand for training of quality skilled process operatives and craftspersons. In response to this demand in 2005 FรS decided to โฆ View the procurement ยป