Procurements: Parts of gas turbines

12 archived procurements

Recent procurements of parts of gas turbines in Ireland

2022-04-04   AG1889R - Supply, Delivery, Installation & Commissioning of Animal Housing Equipment (Education Procurement Service (EPS))
The Contracting Authority is seeking to procure rodent housing equipment for its breeding area to increase the holding capacity per square metre. The housing equipment will be based on a rack and cage system to create a number of individually ventilated cages. This will require suitable mobile air handling units (AHU’s) which will condition the incoming air and exhaust to the main building AHU system. Changing stations will also be required to permit safe manipulation of the cages without the rodents … View the procurement »
2021-04-21   Sale of Gas Turbine Equipment (Electricity Supply Board (ESB))
ESB is examining the potential for sale used V.94.2 gas turbine equipment that is no longer in use. Details of equipment on offer are available upon request. Request can be made via the e-tenders message system. This is one set of used (un-refurbished) fourth stage turbine vanes. Interested parties should note that this selection process is not governed by the provisions of Directive 2004/18/EC or Directive 2004/17/EC (or the Irish regulations transposing those Directives) and ESB does not intend to … View the procurement »
2020-06-17   Sale of Power Plant Equipment (Electricity Supply Board (ESB))
ESB is examining the potential to offer for sale power plant equipment that is no longer in use. The equipment for sale includes: • gas turbines, • gas turbine spares (unused), • fuel handling plant for solid fuels, • gas fired boiler, • solid fuel boilers, • condensing steam turbines, • generators, • transformers, • associated equipment with above, • other associated spare parts for above (unused). Equipment is suitable for power plant outputs in the range 85 to 270 MW electrical. Interested parties … View the procurement »
2019-04-25   SWSOS Turbine Air Intakes Replacement (Ervia on behalf of GNI UK Limited (in which case the Contract will be with GNI UK Limited))
Contract for the design and build of 7 No. air intakes to existing gas turbines in natural gas compressor stations in 2 locations in South West Scotland. The scope includes the removal and replacement of existing air intakes for both combustion and ventilation air for 3 No. Solar Taurus 70 Turbines at the first location and 4 No. Solar Mars 100 Turbines at the second Location. The scope will include design, manufacture, supply, installation, commissioning and certification of the new air intakes. The … View the procurement »
Mentioned suppliers: Cullum Detuners Ltd
2017-08-11   Brighouse Bay Compressor Station Turbine Control System Upgrade (Units A-C) (Ervia)
The design, manufacture, delivery, installation, commissioning, performance evaluation, certification, maintenance and training in respect of safe use of gas turbine control systems and on package ancillaries. View the procurement »
2016-01-21   Provision of a service for the Supply on demand of Carbon Dioxide gas (CO) including a service to assist in training... (Department of Agriculture, Food and the Marine)
This public procurement competition relates to (1) The delivery and supply on demand, to an enclosed animal/poultry house, of CO for the purposes of whole house gassing of animals/poultry in the event of a disease outbreak including an outbreak of Avian Influenza, to any part of the island of Ireland within 36 hours of request being made and (2) Assist in health and safety training on the proper use of CO to include a demonstration on the infusion of CO. DAFM is acting in co-operation with the Department … View the procurement »
2015-08-26   SWSOS Operations and Maintenance Contract (Ervia)
The scope of work will involve all activities associated with the local operation, maintenance and emergency response of the above high pressure transmission pipeline system and installations, in accordance with all relevant gas industry/statutory regulations including but not limited to I.G.E.M.TD1/TD9/TD13; G.S.(M)R/96; P.S.R./96, and GNI UK procedures; relevant environmental licence regulations and legislation. View the procurement »
2015-08-26   Northern Ireland Operations and Maintenance Contract (Ervia)
The scope of work will involve all activities associated with the local operation and maintenance of the above Transmission pipeline System and installations up to an operating pressure of 75 bar in accordance with all relevant gas industry/statutory regulations including but not limited to I.G.E.M.TD1/TD9/TD13; G.S.(M)R/96; P.S.R./96, and GNI UK Procedures; relevant environmental licence regulations and legislation. View the procurement »
2015-05-28   South West Scotland Onshore System Operations & Maintenance System, on behalf on GNI UK (Ervia)
The Scope of Work will involve all activities associated with the local operation, maintenance and emergency response of the Transmission Pipeline System and installations, including Compressor Stations, up to an operating pressure of 150 bar in accordance with all relevant gas industry/statutory regulations, GNI(UK) Ltd's procedures and work Instructions. Further information is available in the Pre-Qualification Questionnaire. View the procurement »
2014-09-12   Brighouse Bay Compressor Station Turbine Air Intake Upgrades (Bord Gáis Éireann/Ervia)
BGE (UK) Limited wishes to pre-qualify suitable candidates for the site survey, design, supply, fabrication, installation, commissioning and handover of air intake housing and filtration upgrades to three existing open cycle gas turbines at Brighouse Bay Compressor Station in Scotland. View the procurement »
Mentioned suppliers: Callum Detuners Ltd
2013-10-11   PG108T893 Poolbeg Gas Turbine Capital Spares (Electricity Supply Board)
Poolbeg CG15 and CG14 are Siemens manufactured V94.2 Gas Turbines Version 3 with HR3 burners and a firing temperature of 1060 Celsius. Both Units completed 100 000 EOH LTE Inspections in 2011. HGP inspections are due in 2015 and there is a requirement for some gas turbine capital spares. Note ESB is seeking information on the following three options for supply of parts. 1. New OEM V94.2 / SGT5-2000E capital spares manufactured by Siemens or Ansaldo will be considered. 2. New Non OEM V94.2 / SGT5-2000E … View the procurement »
Mentioned suppliers: Siemens Limited
2011-02-14   ME3238KM - Maintenance services for engineering facilities (Iarnrod Eireann-Irish Rail)
Iarnród Éireann is seeking tenders for the maintenance of its various engineering facilities. This will be a framework agreement and it is intended that the duration of this agreement will be 3 years with the option of extending for a further 2 single years. Interested parties will be asked to supply bids against the specification that will be provided and also to offer alternative bids based on experience and best practice. Contracts may be awarded against "lots" which will be divided according to … View the procurement »