2022-11-23Provision of a Framework Agreement for Civil Works Balance of Plant (CBOP) to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from suitably qualified candidates for inclusion on a Framework Agreement for Civil Works Balance of Plant (CBOP) for a significant pipeline of wind development projects. Please find attached our expression of interest document (in PDF and Word format) which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage.
View the procurement »
2022-11-02Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements.
Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage.
View the procurement »
2022-03-28Provision of Land Services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invite expressions of interest to suitable candidates for provision of Land Services in respect of the following categories (lots):
1. Land Identification and Mapping
2. Land Agency Services
3. Turbine Delivery Route Assessment
4, Declaration of Identity Services
5. Other Land Based Services
Please note that candidates can apply for one, more or all lots. Please find a Pre-Qualification Questionnaire attached with details of requirements.
View the procurement »
2022-03-02Civil Balance of Plant for Derrinlough Wind Farm (Bord Na Mona)
The Company intends to procure to procure works, supplies and design and build services related to the civil balance of plant for the Derrinlough Wind Farm project. The Company plans to develop the project commencing in 2022. The scope of work for Contract shall include the design, procurement, and installation. Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice for further information on the scope and tender process.
View the procurement » Mentioned suppliers:Bam Civil Limited
2021-12-17Inclusion on a Framework Agreement for provision of legal services to FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland (the “Contracting Entity”) are seeking to invite suitably qualified firms who are interested in participating in this competition for inclusion on a Framework Agreement regarding the provision legal services.
The core scope of services required from the selected candidate(s) will include, but is not limited, to the items set out in the Pre-Qualification Questionnaire (PQQ) attached to this notice. Please note that the services are categorised into four lots. Candidates may apply for …
View the procurement »
2021-03-04Civil Balance of Plant for Derryadd Wind Farm (Bord Na Mona)
The company intends to procure to procure works, supplies and design and build services related to civil balance of plant for the Derryadd wind farm project.
The company plans to develop the project commencing in 2021. The scope of work for contract shall include the design, procurement and installation.
View the procurement »
2019-11-22Inclusion on a Wind Energy Framework Agreement for Provision of Environmental and Planning Services to Coillte CGA (Coillte CGA)
Coillte CGA invites expressions of interest from suitably qualified candidates for inclusion on a wind energy framework agreement for environmental and planning services. Please find attached a summary document which provides further details of our requirements and instructions to candidates.
Interested parties must complete the pre-qualification questionnaire attached to this notice and take note of the deadline for receipt of submissions.
View the procurement »
2019-06-12Provision of Environmental and Planning Services for Ballynagree Wind Farm (Coillte CGA)
Coillte CGA (Coillte, or the company) is requesting expressions of interest from candidates with relevant qualifications and experience for the provision of the environmental and planning services for Ballynagree Wind farm described in the summary document attached.
Please complete the pre-qualification questionnaire attached and return by the deadline stated in order to be considered for this competition.
View the procurement »
2018-10-17Community Services for Renewable Energy Participation/Investment Models (Coillte CGA)
Coillte are seeking expressions of interest from suitably qualified community development advisors to lead the delivery of a number of objectives as set out in the summary document attached.
Please also find attached a pre-qualification questionnaire document which will need to be completed by the deadline date stated,
It is our intention to use a competitive dialogue procedure for this tender competition.
View the procurement »
2018-03-23Soliciting interest to invest in Coillte’s portfolio of recently commissioned operating wind farms (Coillte CGA)
Coillte CGA is inviting potential investors to bring forward proposals for:
A— the acquisition of the majority of the equity of Coillte’s share of 4 operating wind farms, in total reflecting 104 MW on a net equity basis (240 MW gross) of operating capacity, and
B— the potential future acquisition of 2 projects currently in final planning review, representing 67.5 MW on a net equity ownership basis (90 MW gross), upon achieving either financial close or commercial operations.
Coillte reserves the right to …
View the procurement »
2015-05-06Civil Works Balance of Plant for Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Cullenagh wind farm project.
Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2015-04-27Electrical Works Balance of Plant for Coillte Cullenagh Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Cullenagh wind farm project. Further information is available in the following documents which are attached to this notice:
1. Expression of interest document;
2. Pre Qualification Questionnaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2015-03-13Supply of operation and maintenance services for Coillte Windfarm (Coillte Teoranta)
Including the following (but not limited to):
Review of existing HSE documentation and a ground-level visual inspection of all civil, structural, mechanical electrical infrastructure and works associated with the wind farm facility, shall compile a site-specific Health and Safety Management system including a comprehensive Operations Health and Safety Plan, implement the Renewable UK Wind Turbine Safety Rules (WTSR), shall act as Operational Controller and carry out and record Transfer of Control (TOC) …
View the procurement »
2014-12-03Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire.
Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions.
View the procurement »
2014-03-28Civil Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for civil works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre-qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2014-03-28Electrical Works Balance of Plant for Coillte Sliabh Bawn Wind Farm Project (Coillte Teoranta)
Coillte wishes to invite expressions of interest from suitably qualified candidates for electrical works balance of plant in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of interest document 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2013-12-12Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project.
Further information is available in the following documents which are attached to this notice:
1. Expression of Interest document.
2. Pre Qualification Questionaire document.
In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated.
View the procurement »
2013-02-01RT12_040 - A multi-provider framework for Planning & Environmental Services (Bord Gais Eireann)
BGE is undertaking a competitive tendering process, seeking to enter into multi-provider framework agreements with a number of providers to meet its requirements for the provision of:
1) Planning & Environmental Assessment;
2) Archaeological, Architectural & Cultural Heritage;
3) Hydrology, Hydrogeology & Water Quality;
4) Geotechnical;
5) Noise & Vibration;
6) Landscape & Visual Impact Assessment;
7) Geographical Information Systems (GIS) & Computer Aided Design (CAD) ;
8) Shadow Flicker Assessment;
9) …
View the procurement »
2012-10-05Selection of Consultancy Services Panels for Coillte’s Wind Farm Projects (Coillte)
Introduction.
Coillte Wind Energy request expressions of interest for the qualification of service providers for the provision of various services across 5 separate lots as outlined below:
Lot 1: EIA and Engineering Consultancy.
Lot 2: Wind Analysis.
Lot 3: Grid and Electrical Infrastructure.
Lot 4: Mechanical and Electrical Procurement Consultants.
Lot 5: Radio Analysis and Planning Services.
Background to Coillte:
Coillte was established under the Forestry Act 1988, which defines the principal …
View the procurement »
2011-02-28Multi supplier framework for civil contracts relating to Bord Gáis wind farm development (Bord Gais Eireann)
This pre-qualification questionnaire is issued by Bord Gáis Éireann (“the Client”) for the purposes of providing information to applicants interested in applying to pre-qualify and proceed to the tender stage for the procurement of a framework for the provision of certain civil construction works in connection with the development of wind farms by the client (or any subsidiary of the client).
The anticipated scope of civil works applicable to the framework includes but is not limited to the following …
View the procurement »