2020-07-02National Concert Hall Redevelopment Programme Acoustic and Theatre Consultant (Office of Public Works (OPW))
The National Concert Hall (NCH), as part of the Earlsfort Terrace Cultural Quarter development, will consist of a three-phased development involving major refurbishment of the complex. Phase 1 involves enabling works including works to pathology building, provision of temporary boilers, statutory approval for demolition of anatomy building, rationalisation of Butler Wings, relocation of
NCH restaurant and call centre. Phase 2 involves refurbishment, upgrade and extension to existing 1 865 block, …
View the procurement »
2020-04-16Consulting Architectural Services Framework (Office of Public Works (OPW))
The Commissioners of Public Works in Ireland intend appointing a number of architectural consultants to a professional architectural services framework. Services will be in relation to capital projects (ranging from minor to intermediate in scale) and reactive and planned maintenance work.
The works will be for new and existing buildings, some of which can be heritage buildings. Some works will be undertaken in live buildings, leading to multi-phased projects, which are management intensive.
View the procurement »
2020-04-15New Bailieborough Garda Station — Electrical Contract (Reserved Specialist Procedure) (Office of Public Works (OPW))
Electrical element of works. Main works:
— demolition of a three storey rear extension to the north of the NIB building, concrete building to rear of NIB building and out-buildings;
— conservation of NIB building;
— construction of a new three storey over basement building, linked to NIB building at ground and first floor level, with a partial plant storey at roof level;
— provision of carparking, bicycle and motorcycle parking;
— landscaping of external forecourt to include replacement accessibility …
View the procurement »
2020-04-15New Bailieborough Garda Station — Mechanical Contract (Reserved Specialist Procedure) (Office of Public Works (OPW))
Mechanical element of works.
Main works:
— demolition of a 3 storey rear extension to the north of the NIB building, concrete building to rear of NIB building and out-buildings;
— conservation of NIB building;
— construction of a new 3 storey over basement building, linked to NIB building at ground and first floor level, with a partial plant storey at roof level;
— provision of carparking, bicycle and motorcycle parking;
— landscaping of external forecourt to include replacement accessibility ramp, set …
View the procurement »
2020-04-15Block J, Garda HQ, Phoenix Park (Office of Public Works (OPW))
The project involves the full refurbishment of a 1 770 m, two-storey, historic building and protected structure, as offices to accommodate a highly specialist unit within An Garda Síochána. The building is part of the original development of the barracks at Garda Headquarters in the Phoenix Park, from circa 1 842.
The development will necessitate the demolition and the removal of the existing temporary accommodation located to the rear of the building. It will also include the removal and relocation of a …
View the procurement » Mentioned suppliers:Mott MacDonald (Ireland) Ltd
2020-02-08Electrical Services (Office of Public Works (OPW))
The commissioners of Public Works in Ireland has a requirement for the provision of electrical services at Dublin Castle, Farmleigh House, Castletown House and Iveagh House. The requirement will be based on a minimum of 2 electricians for a 40 hour week based on 8.30 a.m.-5 p.m. From time to time the requirement may increase, there will be a requirement for out of hours attendance at all venues from time to time to include evenings and weekends.
View the procurement » Mentioned suppliers:ETAV Limited
2020-01-21Maintenance Management Services (Office of Public Works (OPW))
This is a resourced-based contract. The Office of Public Works has set the type and quantity of resources to be applied to the contract. The tasks detailed in this document ‘Description of Service’, describe the service as required by the Office of Public Works.
The requirement of the contract is to manage and resource the day-today maintenance service of:
— the mechanical and electrical section of the OPW on a national basis,
— the Regional Building Fabric Maintenance Service,
— processing all building …
View the procurement » Mentioned suppliers:Vector Workplace and Facility Management Ltd
2019-12-23New Bailieborough Garda Station — Main Contract (Reserved Specialist Procedure) (Office of Public Works (OPW))
Demolition of a 3 storey rear extension to the north of the NIB building, a 1 storey concrete building to rear of NIB building and 2 No out-buildings; conservation and change of use of building; construction of a new 3 storey over basement building, linked to building at ground and first floor level, with a partial plant storey at roof level; provision of carparking, bicycle and motorcycle parking; landscaping of the external forecourt to include replacement accessibility ramp, set down area and revised …
View the procurement »
2019-12-18Cashen Estuary Drainage Project — Site Investigation (Office of Public Works (OPW))
A site investigation survey is required along the area of proposed works in order to provide information for the detailed design of the new electric/wind pumping stations and culverts in each individual polder as well as the upgrade of the existing sluices and the design of any other ancillary civil work such as new access tracks,new electric power supply cable routes, chambers, kiosks etc. The site investigation location is set out in drawings included in the tender documents.
View the procurement » Mentioned suppliers:Priority Geotechnical Ltd