2013-10-11PG108T893 Poolbeg Gas Turbine Capital Spares (Electricity Supply Board)
Poolbeg CG15 and CG14 are Siemens manufactured V94.2 Gas Turbines Version 3 with HR3 burners and a firing temperature of 1060 Celsius.
Both Units completed 100 000 EOH LTE Inspections in 2011. HGP inspections are due in 2015 and there is a requirement for some gas turbine capital spares.
Note ESB is seeking information on the following three options for supply of parts.
1. New OEM V94.2 / SGT5-2000E capital spares manufactured by Siemens or Ansaldo will be considered.
2. New Non OEM V94.2 / SGT5-2000E โฆ
View the procurement ยป Mentioned suppliers:Siemens Limited
2012-11-22Refurbishment of Generator Rotors and Related Services (Huntstown Power Company Limited)
The first lot of this service contract is for the refurbishment of generator rotors (100 to 300 MVA), incorporating critical engineering upgrades to the rotor end windings and pole cross-over connections. This lot is mandatory and tendererโs bid shall include this lot.
The second lot is for the maintenance services for the generator stators. This lot is mandatory and tendererโs bid shall include this lot.
The third lot is for additional engineering improvements to the rotor end windings, shaft and โฆ
View the procurement ยป Mentioned suppliers:Siemens Limited