2019-02-06Service Reservoir Major Repairs 2019–2021 (Irish Water)
Irish Water is seeking to engage Contractors experienced in undertaking major repairs to service reservoirs (potable water) to advance the Service Reservoir Major Repairs Programme 2019–2021. It is anticipated that there will be an requirement to repair circa 30 sites within the 3-year contract period, these being divided into 2 lots:
— lot 1 — North/West (Connaught/Ulster) and East/Midlands,
— lot 2 — South. (See map in Background Information).
The work will require PSDP and PSCS services.
The number of …
View the procurement » Mentioned suppliers:BSG Civil Engineering LtdMcBreen Environmental Drain Services Ltd
2018-11-30Service Reservoir Cleaning and Minor Repairs 2019-2021 (Irish Water)
Irish Water, is seeking to engage Contractors experienced in cleaning and undertaking repairs to service reservoirs (potable water) to advance the Service Reservoir Programme 2019-2021. It is anticipated that there will be an initial requirement to clean circa 300 sites within the 3 year contract period, these being divided into 3 Lots: (Lot 1 — North/West, Lot 2 1 East/Midlands, Lot 3 — South). (See map in Background Information).
The work will require PSDP and PSCS services.
The number of reservoir …
View the procurement » Mentioned suppliers:Acorn Recycling LtdBSG Civil EngineeringMcBreen Environmental Drain Services Ltd
2017-04-27Ring Helvick Water Supply Scheme (Irish Water)
Ring Helvick Water Supply Scheme works are:
Connection to the existing water supply network.
new pumping station
2 No. reservoir sites
Installation of a 6 150 m 250 mm rising main with surge vessel
2 No. 150 m³ reservoirs
Construction of a control building
Installation of pumping plant and equipment
Installation of 640 m of 125 mm OD SDR11 HDPE rising from the Lower Reservoir site to the Upper Reservoir site.
Construction of 1 No. 300 m³ reservoir
Installation of 5 970 m of distribution pipework
Civil …
View the procurement » Mentioned suppliers:David Walsh Civil Engineering Ltd
2016-07-0616/138 — Tuam Regional Water Supply Scheme Extensions Project — Phase 1 Works Contract (Irish Water)
Includes:
—Contractor design and construction of approx 35 km of new watermains at various locations throughout Co. Galway including Loughrea, Dunmore, Glenamaddy, Kilkerrin and Moylough;
—The watermains will range from 140 mm OD (125 mm DN) to 400 mm OD (350 mm DN);
—Contractor design and construction of an approx 1 000 m³ Storage Reservoir;
—Approx 5 no. pressure boosting stations;
—Decommissioning of 5 no. existing WTPs;
—Installation of chlorine monitoring and boosting stations;
—Adjustments to …
View the procurement » Mentioned suppliers:Shareridge/Farrans JV
2016-06-2916/097 — Tullamore and Birr Water Supply Schemes Project (Irish Water)
Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (‘DBO’) Contract.
View the procurement » Mentioned suppliers:Murphy Process Engineering Ltd