2023-05-30Marina Park Phase 2 (Cork City Council)
The proposed Marina Park Phase 2 is situated between Cork City South Docklands and Blackrock Village. The scheme aims to provide an โeco-parkโ and an area of high-quality public realm and landscape, while protecting and enhancing the natural heritage and biodiversity of the area. The scheme aims to improve public accessibility and amenities through the site. It includes the restoration and protection of historical structures and the creation of points or interest and park attractions such as โNatureโ โฆ
View the procurement ยป
2023-04-07TII369 (Transport Infrastructure Ireland (TII))
The works described below are split into three separate lots to undertake routine maintenance of circa 1800 National Road Bridge structures in the Republic Of Ireland.
The Lots are:
1. North West Bridges Term Maintenance Contract No. 4
2. Munster Bridges Term Maintenance Contract No. 4
3. Leinster Bridges Term Maintenance Contract No. 4
The scope includes for Annual Routine Maintenance of bridge structures nationwide within a five year maintenance contract, including vegetation clearance, cleaning โฆ
View the procurement ยป
2022-04-04A Lightweight Modular General Support Bridge (Irish Defence Forces)
In summary, the Goods comprise: The Corps of Engineers are seeking the provision of a lightweight modular military general support bridge to provide a general support bridging capability to the Defence Forces. The bridge must have a span no less than 30m and no more than of 35m across a wet or dry gap with an MLC of 70T. The bridge system must provide a roadway width of 4m with parapet/handrails. The option of segregated walkway with handrails can also be priced. The bridge comprises of a girder bridge โฆ
View the procurement ยป Mentioned suppliers:WFEL Ltd
2022-02-10Louth County Council Narrow Water bridge Wind study and wind tunnel test (Louth County Council)
This commission seeks to engage a competent and experienced
Wind Testing Laboratory to undertake and report on a regime of
Wind Tunnel Tests of a cable stayed bridge and rolling bascule
opening span. The laboratory will be required to carry out wind
climate analysis and several wind tunnel tests of the deck and the
tower to assess the aerodynamic behaviour of the structure, such
as sectional model tests and assessment of wind shielding
efficiency. The laboratory is required to issue a report on the results
View the procurement ยป
2021-04-07The Irish Defence Forces Corps of Engineers requires Assault Bridging Equipment for Use to Support Defence Forces... (Irish Defence Forces)
The Irish Defence Forces Corps of Engineers requires Assault Bridging Equipment for use to support Defence Forces operations and training activities in Ireland. These bridge systems should be capable of spanning a wet or dry gap up to 30 m in span.
The bridge should consist of a series of man portable panels which are joined together and cantilevered across the gap. The Bridge system and all component parts should be stored on a frame/in a container no larger in dimensions than a 20ft ISO Container. The โฆ
View the procurement ยป Mentioned suppliers:Arcon Consultants
2019-09-27Carrigaline Western Relief Road (Cork County Council)
Construction of a single 750 m carriageway road. The CWRR will run along the southern boundary of Nova Court residential estate, before crossing over the Owenboy River, by means of a 32 m reinfroced concrete river bridge. Current land-use within the CPO lands primarily comprises Greenfield lands; however residential properties and brownfield sites are located in the northern portion of the proposed CWRR route. Pedestrian and traffic lights will be placed at the north, south and central junctions to โฆ
View the procurement ยป Mentioned suppliers:BAM Civil Ltd