2023-03-16   FASTER: PROJECT INFORMATION MEMORANDUM AND PRE-QUALIFICATION QUESTIONNAIRE (PQQ) (Louth County Council)
PROJECT INFORMATION MEMORANDUM AND PRE-QUALIFICATION QUESTIONNAIRE (PQQ) FOR Design, Build and Operate (DBO) contract for the FASTER Project - Provision of Rapid Electric Vehicle Charging Infrastructure along the border counties in Ireland FOR LOUTH COUNTY COUNCIL View the procurement ยป
Mentioned suppliers: Weev.ie Ltd
2018-08-22   Greenlink Interconnector Project (Greenlink Interconnector Limited)
Greenlink Interconnector Limited is developing a 500 MW HVDC interconnector system between the existing electricity grids in Ireland and Wales (UK). The interconnector will provide a new grid connection between Great Island transmission substation in County Wexford, Ireland and Pembroke transmission substation in South Wales. The Greenlink Interconnector cable route is approximately 205 km in length between the Pembroke Converter Station and the Great Island Converter Station of which 7 km is onshore in โ€ฆ View the procurement ยป
2011-01-19   Garracummer 38 kV cable, electrical & civil power distribution works, Hollyford, Co. Tipperary (Garracummer Wind Farm Limited (company number 383356 and registered office Gasworks Road))
The proposed contestable 38 kV cable works (electrical (incl. fibre optic cable) & civil) is associated with the Garracummer (37.9 MW) and Hollyford (9 MW) wind farms located near the village of Hollyford Co. Tipperary. As per their respective connection agreements these wind farms connect into the proposed Multeen 38/20 kV substation on the Garracummer wind farm site, which in turn connects into the transmission network via approx 17.5 km of 38 kV cable to a looped 110/38 kV substation (presently under โ€ฆ View the procurement ยป
Mentioned suppliers: Denis Moriarty The Kerries Limited