2023-05-30Marina Park Phase 2 (Cork City Council)
The proposed Marina Park Phase 2 is situated between Cork City South Docklands and Blackrock Village. The scheme aims to provide an โeco-parkโ and an area of high-quality public realm and landscape, while protecting and enhancing the natural heritage and biodiversity of the area. The scheme aims to improve public accessibility and amenities through the site. It includes the restoration and protection of historical structures and the creation of points or interest and park attractions such as โNatureโ โฆ
View the procurement ยป
2022-04-21Greencastle Breakwater (Donegal County Council)
Donegal County Council is undertaking a joint pre-qualification and tender process to identify a contractor to undertake the construction of the Greencastle Breakwater works.
The following works are included.
โข Alterations to the existing breakwater
โข Construction of approximately 130m of new breakwater
โข Construction of reinforced concrete walkway and wave wall along the length of the entire breakwater
โข Installation of ducting, chambers, and lighting
View the procurement ยป
2021-03-19Royal Canal Greenway Phase 3 (Dublin City Council)
The project consists of a Greenway route along the bank of the Royal Canal over an approximate 2.1 km length between North Strand Rd (Newcomen Br) and Phibsborough Rd (Cross Guns Br).
Further details are provided in the tender documentation and RFT 185616 available on www.etenders.gov.ie
View the procurement ยป
2020-11-11Blackglen Road Improvement Scheme (Dun Laoghaire Rathdown County Council)
The scheme commences at Lamb's Cross junction (R117) and extends approximately 1.4km to the junction with Ticknock Road (adjacent to the M50 overbridge). The proposed scheme also includes approximately 375m at the 3 tie-in roads at Lambs Cross, Enniskerry Road, Sandyford Road and Hillcrest Road and 55m at Ticknock Road.
The proposed Scheme also includes an improvement to the junction of Grange Road/Harold's Grange Road/College Road/Kellystown Road. The length of improved roads at this junction is โฆ
View the procurement ยป Mentioned suppliers:Murphy International Limited
2019-09-06Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
(a) the change of use of the Phase 1 sports and community building to a library and community building;
(b) refurbishment of the existing sports building to create a new library;
(c) the construction of a new sports building, incorporating a 25 metre swimming pool, a โฆ
View the procurement ยป
2017-02-20Bathroom Pods in 3 phases (University College Dublin (UCD))
UCD wishes to establish a multi party framework agreement with competent organisations for the design, manufacture, supply and delivery of pre-fabricated, pre-cast concrete frame Bathroom Pods for Student Accommodation. The works for the overall Framework will comprise approximately 3 000 Bathroom Pods. Phase 1 is to include for approximately 920 bathroom pods, with approximately 1 250 in Phase 2 and 830 in Phase 3.
View the procurement ยป
2012-09-21Bothar na dTreabh (N6) Mulit-Modal Corridor Improvement Scheme Pedestrian Connectivity - Phase B (Galway City Council)
A new ramp and flight of steps is proposed to provide a new pedestrian link between the Dyke Road and the N6 Bothar na dTreabh to the north east of Quincentennial Bridge. Also minor works are proposed to the existing footway and cycleway on the Bothar na dTreabh (N6).
Note: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=508132.
View the procurement ยป
2012-08-02Bothar na dTreabh (N6) MMCI Scheme Pedestrian Steps P2 (Galway City Council)
A new flight of steps is proposed to provide a new pedestrian link between the NUIG Distributor Road and the N6 Bothar na dTreabh to the south west of Quincentennial Bridge. In addition cycle guide rails are to be fitted to the existing steps located to the north west and south east of Quincentennial bridge.
Also minor works are propsoed to the existing footway and cycleway on the Bothar na dTreabh (N6).
Note: To register your interest in this notice and obtain any additional information please visit the โฆ
View the procurement ยป Mentioned suppliers:Coffey Construction (I) Limited