2023-07-26   IWAK RWY26 RESA Upgrade (Connaught Airport Development Company Ltd)
The objective for this project is to upgrade the RWY 26 RESA and the associated an ancillary works to ensure that the RWY 26 RESA is fully the exiting RESA against clauses from Chapter C – Runway End Safety Area of the European Union Aviation Safety Agency (EASA) Certification Specifications and Guidance Material for Aerodrome Design (CS-ADR-DSN) Issue 6. View the procurement »
2023-07-12   P18599 South Apron Hub Construction (daa plc)
The South Apron Hub (SAH) development forms part of the overall North Apron and South Apron Hub (NASAH) programme of works, which comprises a series of transformation projects to facilitate operational efficiency improvements and capacity enhancement at Dublin Airport. View the procurement »
2023-04-06   North Apron Hub Development (daa plc)
This RFI is the first stage in the procurement process to identify a suitably experienced building Contractor to design, procure, construct, test and commission, put into service (including assisting the Contracting Authority with Operational Readiness and Airport Transfer) and undertake close-out activities for the NA development at Dublin Airport. View the procurement »
2022-07-21   Solar Photovoltaic Farm Frameworks (1) (daa plc)
The Contracting Authority, wishes to put in place a Framework Agreement with a suitably qualified contractor to act on behalf of the Contracting Authority in developing a 7,500kWp minimum Solar Photovoltaic (PV) plant within the Dublin Airport campus to provide on-site renewable electricity to Dublin Airport. The Contracting Authority previously advertised this opportunity (2022/S 079-213723) due to changes in the Contracting Authorities requirements we are re-advertising this opportunity. The … View the procurement »
2022-04-19   Solar Photovoltaic Farm Frameworks (daa plc)
The Contracting Authority, wishes to put in place a Framework Agreement with a suitably qualified contractor (hereafter referred to as the ‘Contractor’) to act on behalf of the Contracting Authority in developing a 7,500kWp minimum Solar Photovoltaic (PV) plant within the Dublin Airport campus to provide on-site renewable electricity to Dublin Airport. The project is currently at concept stage. The Contracting Authority requires a partner to design, build, operate, and maintain the proposed solar … View the procurement »
2021-03-04   Airside and Landside Civil Works Framework (daa plc)
The contracting authority, wishes to put in place two (2) bespoke framework agreement’s with two (2) suitably qualified civil contractor’s to act on behalf of the contracting authority in carrying out: 1) Airside and Landside Civil works (including pavement, concrete and all associated works to successfully deliver a civil works contract) at Dublin Airport; and 2) Construction of a Underpass (including all associated works to successfully deliver the contract) at Dublin Airport, as described in the … View the procurement »
Mentioned suppliers: SISK Lagan JV
2021-02-17   Dublin Airport (DAP) Works Framework Agreement (daa plc)
The scope of the projects issued under the WP11 Dublin Airport (DAP) works framework agreement comprises the design, procurement, construction, testing, commissioning and putting into service of works and services to safeguard the potential for future development at Dublin Airport and improve the existing infrastructure. View the procurement »
2020-11-25   Rehabilitation of Runway 16/34 at Cork Airport (daa plc)
Daa wishes to put in place a bespoke non-exclusive framework agreement with a suitably qualified design and build contractor to act on behalf of daa in carrying out the design and build works associated with rehabilitation of runway 16/34 at Cork Airport, and other associated works as required by daa as described in the RFI documents available at www.etenders.gov.ie Daa will be utilising the accelerated procurement procedure available under Directive 2014/25/EU for this procurement process. Due to the … View the procurement »
Mentioned suppliers: Colas Ltd
2019-04-25   Airfield Civil Contractors Framework 2019+ (daa plc)
Dublin Airport wishes to appoint a framework of experienced main civil contractors as long term partners (2019 to 2024) to assist in the delivery of particular “Airfield” projects (see attached RFI) forming part of the approved PACE works and submitted CIP 2020–2024 works. Dublin Airport are seeking to enter into a collaborative approach with suitably qualified civil contractors to facilitate the delivery of these works, which we have bundled into 2 distinct packages (Lot 1 and Lot 2). This RFI seeks to … View the procurement »
2017-11-14   Design and Construction Services for North Apron 5H Stands Main Works (daa plc)
The successful Contractor will be required to assemble a Design and Construction team led by a Project Manager to undertake the detailed design and construction of Stand 5H and the associated infrastructure. The proposed development of Apron 5H is located in the northern part of Dublin Airport, south-east of the future North Runway (NR) and future Parallel Taxiway (FPT) and east of Apron 5G. View the procurement »
2017-06-16   HBS Upgrade / Baggage Integrators (daa plc)
Daa currently has a number of baggage handling system installations at Dublin and Cork Airports. As a result of upcoming regulatory compliance requirements and in response to the increased capacity requirements and need to consider asset life replacements of existing installations, the daa wishes to procure the services of a baggage integrator(s) for three (3) Lots (Dublin T1, Dublin T2 and Cork) to act as design and build contractor for the design, supply, installation, testing and commissioning and … View the procurement »
2017-04-25   HBS Upgrade / Baggage Integrators (daa plc)
Daa currently has a number of baggage handling system installations at Dublin and Cork Airports. As a result of upcoming regulatory compliance requirements and in response to the increased capacity requirements and need to consider asset life replacements of existing installations, the Daa wishes to procure the services of a baggage integrator(s) for three (3) Lots (Dublin T1, Dublin T2 and Cork) to act as design and build contractor for the design, supply, installation, testing and commissioning and … View the procurement »
2017-01-23   RFI for Shannon Airport Aircraft Hangar and Taxiway Project (Shannon Airport Authority DAC)
The Works Contractor shall be responsible for the construction of a new 7 200 m² steel framed aircraft hangar clad with insulated panels within the airport lands at Shannon Airport, Co. Clare, Ireland. The area includes for ancillary office space, workshops, plant rooms and storage space. Site works including car parking, landscaping and civil works. The hangar will have an approximate 90m clear span steel roof truss with the works being carried out in poor ground conditions requiring significant ground … View the procurement »
Mentioned suppliers: L&M Keating Ltd
2016-03-15   Pre-Qualification Questionnaire (PQQ) for Construction Works relating to Runway 06/24 Rehabilitation and Associated... (Shannon Airport Authority plc)
Shannon Airport Authority (SAA) wishes to appoint a suitably qualified and experienced Contractor to deliver the Runway 06/24 Rehabilitation and Associated Works project at Shannon Airport. View the procurement »
Mentioned suppliers: Lagan Asphalt Ltd
2015-09-07   Runway 10/28 and Associated Taxiways Rehabilitation and Enhancements to (Dublin Airport Authority plc (DAA))
This particular project is located within Dublin Airport (airside) which opened to operations in 1941. In 1950, annual passenger traffic was recorded at 212 661 persons with 16 769 air transport movements. By 2008, passenger numbers had risen to some 23 500 000 (passengers) with more than 210 000 commercial air transport movements. During 2008-2012 these numbers reduced, however Dublin Airport has enjoyed steady growth since then and in 2014 there were 21 700 000 passengers. The airport has progressively … View the procurement »
2015-05-14   Capacity Development Management Building Contract at Dublin Airport (daa plc)
A 5 year capacity development plan has been prepared to improve functionality and capacity of Dublin Airport. The output of this plan is a requirement to enhance components of the existing building infrastructure. As part of this overall plan, the following works are proposed to be carried out: 1. Pier 2 Segregation; 2. T1 and T2 Bussing Gates; 3. T2 Transfer Facility; 4. Pier 3 Wide Body Facility; 5. T1 Security Screening Facility; 6. New areas created to facilitate displaced staff; 7. Any associated … View the procurement »
2015-01-05   Automatic Tray Return Systems (ATRS) (daa plc)
Daa currently has a number of passenger search areas in service across its 2 Terminals at Dublin (Terminal 1 and Terminal 2) Airport. These Search areas are an essential component of the Terminal operations at each Airport. As well as being required to be efficient and smooth they must first and foremost comply with both EU and International Compliance Regulations. As a result, daa plc intends to upgrade the existing passenger screening systems between 2015 and 2016 to accommodate enhanced security … View the procurement »
2015-01-05   Airside Electrical Installation Framework (daa plc)
The Contracting Authority proposes to appoint between 4 and 8 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield Electrical construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2015 to 2019 inclusive. View the procurement »
2014-08-19   HOB Refurbishment Project (Design and Build) (Dublin Airport Authority plc (DAA))
The Contracting Authority will produce a set of documents prior to issuing the Request for Proposal for the D&B contract; the documents will include Design Intent information accompanied with performance specifications. The documents will be referred to as the ‘Employers Requirements Documents’. The D&B Contractor shall complete the design in accordance with the Employers Requirement Documents with the object of constructing and handing over a refurbished office building fully commissioned and fit for purpose. View the procurement »
2014-03-11   P2108 - Airfield Pavement Construction Framework (Dublin Airport Authority plc (DAA))
The Contracting Authority proposes to appoint between 4 and 12 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield pavement construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2014 to 2017 inclusive. View the procurement »
2013-12-02   P2108 - Airfield Pavement Construction Framework (Dublin Airport Authority plc ( DAA ))
The Contracting Authority proposes to appoint between four (4) and twelve (12) Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield pavement construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2014 to 2017 inclusive. View the procurement »
2013-11-29   P2175 - Retail Street Development / Phase 3 (Dublin Airport Authority plc ( DAA ))
To manage & construct a retail refurbishment in a live operational Airport Terminal Building at Dublin Airport as per the following overview: — Development of a 2000 sq.m. Fit out for a Retail unit. — Development of a 700 sq.m. Shell & Core for a future Fit-Out. — Refurbishment of an 800 sq.m. Public concourse. View the procurement »
2012-03-21   New runway end safety areas at Kerry Airport (Kerry Airport PLC)
The main works subject to this contract contain the following: — Threshold 26 relocation, — CAT I approach lighting system relocation, — Eastern RESA extension to approximately 150mx240m, — Western RESA extension to approximately 150mx240m, — Construction of concrete box to channel open drain, — Construction of Eastern runway turn pad extension, — Construction of Western runway turn pad extension, — Installation of runway guard lights, — Relocation of PAPI, — Relocation of glide path, — Reparation of … View the procurement »