2021-03-19Royal Canal Greenway Phase 3 (Dublin City Council)
The project consists of a Greenway route along the bank of the Royal Canal over an approximate 2.1 km length between North Strand Rd (Newcomen Br) and Phibsborough Rd (Cross Guns Br).
Further details are provided in the tender documentation and RFT 185616 available on www.etenders.gov.ie
View the procurement »
2019-07-0518/167 — Transmission Pipeline Emergency Response and Repair Services (Ervia)
Provision of emergency response and repair services including materials and equipment for the natural gas high-pressure onshore Ireland transmission network located in the Republic of Ireland (Refer to Appendix 3 of this PQQ for general network map).
Gas Networks Ireland (GNI) requires a single supplier agreement to provide the services as outlined in the scope of work.
For more information please refer to PQQ Document.
View the procurement » Mentioned suppliers:National Gas Transmission Plc
2018-10-05Ballough Bypass (Ervia on behalf of Gas Networks Ireland)
Ballough Above Ground Installation (AGI) is a key piece of infrastructure on the Republic of Ireland transmission gas network. Numerous key pipelines converge on Ballough AGI. The AGI is located west of Lusk in North Co. Dublin adjacent to the M1 motorway.
The scope of this construction contract is to create a bypass around Ballough AGI.
As part of the contract the following new works will be required:
— a new AGI, north of Ballough AGI adjacent to the existing 900 mm Gormanston to Ballough pipeline. The …
View the procurement » Mentioned suppliers:Murphy International Ltd
2018-01-10Center Parcs Gas Feeder Main Project (Ervia)
Works contract for the construction of approximately 21 km of 400 mm PE feeder main gas pipeline and all associated ancillaries (e.g. smaller diameter pipeline and commissioning works) from Ories AGI in Co. Westmeath to Rathmore Co. Longford (more detailed description of scope is contained in the ITT section 1.1 of Part 3- Scope).
View the procurement » Mentioned suppliers:GMC Utilities Group Ltd
2017-09-05Project Indigo Green — Contract 2 (Irish Water)
The scope consists of water pumping station, watermain, foul sewer rising main, and gas related works as per Part 3 — Scope document.
The works will consist of approximately 4.2 km of 140 mm PE SDR17 foul sewer rising main, 4.8 km watermain of various sizes ranging from 355 mm PE SDR17 to 560 mm PE SDR17, a new water pumping station at Loughsallagh and all associated ancillaries.
The works will also construction and testing of circa 5 km of 315 mm diameter PE100 4 bar gas main and all associated …
View the procurement » Mentioned suppliers:GMC Utilities Group Ltd
2017-02-10SWSOS Operation and Maintenance (Ervia)
The Scope of Work will involve all activities associated with the local operation, maintenance and emergency response of the high pressure Network, as described in the PQQ document, in accordance with all relevant gas industry/statutory regulations including, but not limited, to I.G.E.M. TD1/TD9/TD13 or equivalents, G.S.(M)R/96, P.S.R./96 and GNI UK Procedures or equivalent, relevant environmental licence regulations and legislation.
View the procurement »
2017-02-10Northern Ireland Operation and Maintenance (Ervia)
The scope of work will involve all activities associated with the local operation and maintenance of the above Transmission pipeline System and installations up to an operating pressure of 75 bar in accordance with all relevant gas industry/statutory regulations including, but not limited, to I.G.E.M. TD1/TD9/TD13 or equivalents, G.S.(M)R/96, P.S.R./96 and GNI UK Procedures or equivalent, relevant Environmental licence regulations and legislation.
View the procurement » Mentioned suppliers:Murphy International Ltd
2016-11-03Gas to Listowel (Ervia)
This works contract will be for the construction and commissioning of a distribution gas feeder main pipeline to Listowel Town Co. Kerry from Craggs Co. Limerick and include the installation of gas network and associated connections.
View the procurement » Mentioned suppliers:Murphys/GMC
2014-10-23Gas to Wexford Town (Bord Gáis Éireann/Ervia)
This works contract will be for the construction and commissioning of a utility gas network to Wexford Town from Campile Co. Wexford and include the installation of gas network and potentially, the upgrade of some of existing water network at specific locations in Wexford Town. The contract has been subdivided into the following Lots: Lot 1 — Gas Feeder Main, Lot 2 — Wexford Town Gas Network & Lot 3 — Wexford Town Gas & Water Network.
View the procurement » Mentioned suppliers:Roadbridge
2012-12-03RT12_039 - Firmus Energy Construction and Maintenance Works and Services Contract (Bord Gais Eireann)
Firmus energy is currently undergoing the construction of a gas network and associated connections to natural gas within a number of townlands in Northern Ireland including Londonderry, Limavady, Coleraine, Ballymoney, Ballymena, Antrim, Craigavon (including Lurgan and Portadown), Armagh, Banbridge and Newry.
Against this background we will shortly be inviting tenders for a number of services in Northern Ireland, to include: polyethylene mains and service laying; emergency response; materials logistics.
View the procurement »
2011-01-28Pipeline to Great Island Power Station, Co. Wexford (Bord Gais Eireann)
Bord Gáis Éireann is seeking applications from suitably experienced contractors to construct a natural gas pipeline from Baunlusk AGI near Co. Kilkenny to Great Island Power Station, Co. Wexford. The pipeline length is approximately 45 km. The diameter of the pipeline is in a range of 300 mm to 500 mm. The majority of this pipeline will be located in a cross country environment. The project also involves modifications to the existing AGI’s and inclusion of block valve(s) along the route. The scope of …
View the procurement »