Procurements: Construction work for restaurants and similar facilities
9 archived procurements
Construction work for restaurants and similar facilities have been procured by organizations such as Health Service Executive (HSE), Adelaide and Meath Hospital, Dublin Inc. The National Children's Hospital, and Clare County Council.
- Construction work (>20 new procurements)
- Works for complete or part construction and civil engineering work (>20)
- Building construction work (>20)
- Construction work for buildings relating to leisure, sports, culture, lodging and restaurants (12)
- Accommodation and restaurant buildings
- Construction work for restaurants and similar facilities โฌ ๏ธ
Recent procurements of construction work for restaurants and similar facilities in Ireland
2024-09-27
Proposed Refurbishment Works at Connolly Barracks Longford Town (Longford and Westmeath Education and Training Board)
Proposed Refurbishment Works at Connolly Barracks, Battery Road, Longford. Phase 1 (Min 2 training facilities) Refurbishment of existing gymnasium into training center Phase 2 Canteen and Staff Welfare External Works View the procurement ยป
Proposed Refurbishment Works at Connolly Barracks, Battery Road, Longford. Phase 1 (Min 2 training facilities) Refurbishment of existing gymnasium into training center Phase 2 Canteen and Staff Welfare External Works View the procurement ยป
2023-12-04
SOFIII - Advanced + Fit-Out Works @ National Maternity Hospital at St. Vincent's University Hospital Campus (WORKS... (Health Service Executive (HSE))
Advanced + Fit-Out Works at NMH @ SVUH Campus (Works Contractor and as PSCS). The works relate to the creation of a Single Operator Framework, to deliver a series of advanced / fit-out works in connection with the NMH relocation to the campus of St Vincent's University Hospital (SVUH). These works will consist of the construction and fit-out of a number of temporary and permanent structures, including M+E services' upgrades, at various locations both on and off the SVUH campus. Applicants should note โฆ View the procurement ยป
Advanced + Fit-Out Works at NMH @ SVUH Campus (Works Contractor and as PSCS). The works relate to the creation of a Single Operator Framework, to deliver a series of advanced / fit-out works in connection with the NMH relocation to the campus of St Vincent's University Hospital (SVUH). These works will consist of the construction and fit-out of a number of temporary and permanent structures, including M+E services' upgrades, at various locations both on and off the SVUH campus. Applicants should note โฆ View the procurement ยป
2023-07-18
Vandeleur Cafe Fit Out and Building Works (Clare County Council)
Fit-Out of Stable Block to provide New Cafรฉ, Ancillary accommodation and Office Space including siteworks and services View the procurement ยป
Fit-Out of Stable Block to provide New Cafรฉ, Ancillary accommodation and Office Space including siteworks and services View the procurement ยป
2023-05-17
Lot 1 & Lot 2 Works Contractor (Limerick 2030 Strategic Development DAC)
The Contracting Authority, requires Works Contactor(s) for the Construction of the Project Opera Contract C & D Works, which includes the following: Lot 1: โข Parcel 3a refurbishment and new build - New City Library (Town Hall) on all floors including a Cafรฉ/Restaurant at basement level, โข Parcel 3b refurbishment - Retail at basement & ground floor with Residential over, โข Parcel 4 new build - Commercial Office use, Lot 2: โข Parcel 5 new build - Landmark Office building, and โข Parcel 6 refurbishment - โฆ View the procurement ยป
The Contracting Authority, requires Works Contactor(s) for the Construction of the Project Opera Contract C & D Works, which includes the following: Lot 1: โข Parcel 3a refurbishment and new build - New City Library (Town Hall) on all floors including a Cafรฉ/Restaurant at basement level, โข Parcel 3b refurbishment - Retail at basement & ground floor with Residential over, โข Parcel 4 new build - Commercial Office use, Lot 2: โข Parcel 5 new build - Landmark Office building, and โข Parcel 6 refurbishment - โฆ View the procurement ยป
2022-07-14
Enabling + Advanced Works - NMH @ SVUH Campus (Health Service Executive (HSE))
Single Operator Framework for Enabling + Advanced Works - NMH @ St. Vincent's University Hospital Campus. View the procurement ยป
Single Operator Framework for Enabling + Advanced Works - NMH @ St. Vincent's University Hospital Campus. View the procurement ยป
2017-04-04
Extension to existing community cafe (Southill Area Centre)
The works include the construction of new single story extension to the existing 2 story Area Centre building. Renovation works to the cafe and seating area, site works and all ancillary works. View the procurement ยป
The works include the construction of new single story extension to the existing 2 story Area Centre building. Renovation works to the cafe and seating area, site works and all ancillary works. View the procurement ยป
2012-05-21
Science/Canteen Extension Phase 2 (E02) (Institute of Technology Sligo)
Construction of a three storey concrete framed extension with atriums to the South face of the existing 1970 Building (Block B) totalling approx 4 300 sqm of new build together with approx 2 000 sqm of refurbishment to include new mezzanine floor within the existing occupied building. Works include two floors of highly serviced science laboratories, staff offices and associated facilities over a new 500 seat canteen with associated kitchen/servery. Construction of a new Part M compliant pedestrian access โฆ View the procurement ยป
Construction of a three storey concrete framed extension with atriums to the South face of the existing 1970 Building (Block B) totalling approx 4 300 sqm of new build together with approx 2 000 sqm of refurbishment to include new mezzanine floor within the existing occupied building. Works include two floors of highly serviced science laboratories, staff offices and associated facilities over a new 500 seat canteen with associated kitchen/servery. Construction of a new Part M compliant pedestrian access โฆ View the procurement ยป
2011-08-16
License to Design, Finance, Build, Operate and Maintain an Airport Service Station at Dublin Airport (Dublin Airport Authority plc (DAA))
The Airport Services Station Licence is intended to comprise of 2 lots. The first lot is a licence for a site adjacent to the Dublin Airport Exit road North in close proximity to the existing Petrol Filling station. The License will allow the successful candidate to apply for planning permission, and to Design, Finance, Build, Operate and Maintain a Drive Thru Restaurant Facility on the site. The Licensee shall incur all expenses in relation to the planning, design, and construction of the facility and โฆ View the procurement ยป
The Airport Services Station Licence is intended to comprise of 2 lots. The first lot is a licence for a site adjacent to the Dublin Airport Exit road North in close proximity to the existing Petrol Filling station. The License will allow the successful candidate to apply for planning permission, and to Design, Finance, Build, Operate and Maintain a Drive Thru Restaurant Facility on the site. The Licensee shall incur all expenses in relation to the planning, design, and construction of the facility and โฆ View the procurement ยป
2010-11-26
Construction work (Adelaide and Meath Hospital, Dublin Inc. The National Children's Hospital)
Canteen rebuild works contract. The Adelaide and Meath Hospital, Dublin incorporating the National Children's Hospital invite PQQ's from suitable qualified Contrators for the provision of a rebuilding programe to reinstate the Hospitals Catering facility following Fire damage. The Hospital is utilising the restricted accelerated procedure to reflect the urgency to re instate the catering facilities. The Hospital intends following the PQQ submissions to select 5 / 7 submissions to be brought forward to โฆ View the procurement ยป
Canteen rebuild works contract. The Adelaide and Meath Hospital, Dublin incorporating the National Children's Hospital invite PQQ's from suitable qualified Contrators for the provision of a rebuilding programe to reinstate the Hospitals Catering facility following Fire damage. The Hospital is utilising the restricted accelerated procedure to reflect the urgency to re instate the catering facilities. The Hospital intends following the PQQ submissions to select 5 / 7 submissions to be brought forward to โฆ View the procurement ยป