2023-08-21Multi-Supplier Framework Agreement for the Provision of Prototype Mould Services to TUS (Technological University of the Shannon: Midlands Midwest TUSMM)
TUS wishes to form a Multi-Supplier Framework Agreement to which a maximum of four tenderers will be admitted. Tenderers must be in a position to offer a complete turnkey mould production service from product design expertise, through concept to manufacture of the moulds. The successful framework members must be able to offer full consultancy on mould design, product evaluation, DFM, mould design, mould design approval consultation, material process analysis including mouldflow, feed system advice, โฆ
View the procurement ยป
2022-05-25Supply, Installation and Commission of a High Throughput Grinding Mill for Teagasc (Teagasc)
Teagasc invites tenders for the Supply of a High Throughput Grinding Mill. The remit of this project is to provide essential equipment required to meet current research and analysis activities in Teagasc.
The Initial Contract is for the 1 (one) Grinding Mill for Teagasc Animal and Grassland Research and Innovation Programme with the option to drawdown an additional 2 (two) Grinding Mills if the requirement arises during the course of the contract.
View the procurement ยป
2021-05-25The Supply and Delivery of Ready Mixed Concrete to the Athlone Flood Alleviation Scheme 2021 (Office of Public Works (OPW))
Tenders are invited for the supply and delivery of concrete to facilitate flood relief works being carried out on the Athlone Flood Alleviation Scheme (AFAS) in locations at Athlone, Co. Westmeath. The works involve the construction of reinforced in-situ concrete components in the following locations:
Flood Cell 1 โ Deerpark;
Flood Cell 2 โ The Strand, Town Centre;
Flood Cell 3 โ The Quay, Town Centre;
Flood Cell 4 โ Brick Island;
Flood Cell 5 โ Marine View;
Flood Cell 6 โ Iona Park;
Flood Cell 7 โ River โฆ
View the procurement ยป Mentioned suppliers:Kilsaran Concrete
2015-11-26GWM2719 Supply of Mill Balls for ESB Moneypoint (ESB)
Electricity Supply board is the state owned electricity utility in the Republic of Ireland. ESB Moneypoint Generating Station is a coal fired power station with three separate units, each unit comprising of 4 pulverising mills, D8 type Foster Wheeler design. These 12 pulverising ball mills require the supply of up to 600 tonnes of mill balls, in total on an annual basis. The sizing of these mill balls being 50 mm, 30 mm and 20 mm outer diameter and are of a specific high grade material specification.
View the procurement ยป