Procurements: Steam-generating boilers

8 archived procurements

Steam-generating boilers have been procured by organizations such as Electricity Supply Board (ESB), ESB, and Bord Na Mona.
Historically, suppliers within this area have been Alstom Ireland Ltd., Cormetech, Inc., and Cormetech Inc..

Recent procurements of steam-generating boilers in Ireland

2022-03-29   Request for tenders for the supply, delivery and installation of Engineering Laboratory Equipment in IT Sligo (ITSLIGO)
The Institute of Technology Sligo (IT Sligo) is seeking to procure new laboratory equipment, for educational purposes for the Faculty of Engineering and Design in the fields of Hydraulic Engineering, Wind and Hydro Energy, Thermodynamics, and Fluid Mechanics. This Equipment will be used for training, from novice to expert level. Therefore, it must be easy to use, strongly made, and capable of withstanding rough handling and heavy-duty use. The build quality should provide years of excellent service, with โ€ฆ View the procurement ยป
2022-03-25   Boiler Cleaning Services Framework for Edenderry Power Limited (Bord Na Mona)
Expressions of interest are invited from suitably qualified Applicants interested in being considered for the provision of boiler cleaning services for Edenderry Power Limited. The Company intends to establish a multiple supplier Framework Agreement for the provision of these Services. The Company anticipates awarding up to 3 Tenderers a place on the framework, subject to the quality of responses received. The Framework Agreement period will be for four years with the possibility to extend annually for โ€ฆ View the procurement ยป
2020-06-17   Sale of Power Plant Equipment (Electricity Supply Board (ESB))
ESB is examining the potential to offer for sale power plant equipment that is no longer in use. The equipment for sale includes: โ€ข gas turbines, โ€ข gas turbine spares (unused), โ€ข fuel handling plant for solid fuels, โ€ข gas fired boiler, โ€ข solid fuel boilers, โ€ข condensing steam turbines, โ€ข generators, โ€ข transformers, โ€ข associated equipment with above, โ€ข other associated spare parts for above (unused). Equipment is suitable for power plant outputs in the range 85 to 270 MW electrical. Interested parties โ€ฆ View the procurement ยป
2017-05-16   Boiler Tube Replacement Moneypoint Framework Agreement (Electricity Supply Board (ESB))
ESB invites expressions of interest for the following: Design, manufacture, delivery and installation of Boiler components on the three 305MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Moneypoint Generating Station. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the three are expected to take place during outages in 2018 (two units in series) and in 2019 (one unit). Outage dates may โ€ฆ View the procurement ยป
Mentioned suppliers: Alstom Ireland Ltd.
2016-04-16   GWM4576 Boiler Tube Replacement Money-point Framework (ESB)
This Framework is for the design, manufacture, delivery and installation of Boiler components on the 3 305-MWe, Foster Wheeler natural circulation single furnace coal-fired boilers at Money-point Generating Station โ€” works for each unit are likely to be tendered individually. This work will include boiler reheater pressure part replacement including tubing with all attachments and fittings. Refurbishment work on the 3 units will take place during outages in 2017, 2018 and 2019. Outage dates may change โ€ฆ View the procurement ยป
2015-12-21   GWM4277 Moneypoint Unit 2 SCR New Catalyst Layers (ESB)
The contract is for the supply of honeycomb catalyst layers for one 285MWe coal fired boiler at Moneypoint Generating Station. The layers will be installed in a high dust SCR plant. There are two SCR reactors per unit which are situated between the economiser and the airheaters. Each Reactor has three layers of honeycomb catalyst currently installed (Layer 1, 2 and 3), with each Reactor Layer made up of 42 individual catalyst modules comprising a total catalyst volume of approx. 78 m. View the procurement ยป
Mentioned suppliers: Cormetech Inc.
2015-03-20   Thermal Energy Efficiency Project (Irish Prison Service)
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33 % by 2020. To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project โ€ฆ View the procurement ยป
2011-05-30   PG108T778 Moneypoint SCR New Catalyst Layers (ESB Power Generation)
The contract is for the supply of honeycomb catalyst layers for three 305MWe coal fired boilers at Moneypoint Generating Station. The layers will be installed in a high dust SCR plant. There are two SCR reactors per unit which are situated between the economiser and the airheaters.There are two layers of honeycomb catalyst currently installed in each reactor. This work is likely to include supply of honeycomb catalysts in the order of 78m3 volume per layer. Two new layers will be required per unit. Also โ€ฆ View the procurement ยป
Mentioned suppliers: Cormetech, Inc.