Project Management (PM) Led Integrated Multi-Disciplinary Design Team Consultancy Services for Infrastructure Delivery - Flood Mitigation Work at IDA Lands National Technology Park, Co. Limerick
IDA previously carried out a review of the options for flood alleviation at the National Technology Park NTP Limerick. The purpose of the review was to examine viable options to minimise the risk of ingress of flood waters to NTP from the Shannon and Mulcair and manage flood water arising from surface water run off within the park during river flood pluvial flooding. A new flood defence is necessary because the existing flood defence berm provides an insufficient level of protection and currently allows for water seepage beneath the berm through extensive granular soils. There is an existing boundary fence associated with a clientโs facility to the east of the site And this fence will be relocated further to the south to facilitate the construction of the flood defence. Due to environmental constraints identified on the Mulkear River spawning lamprey it is proposed to remove existing stormwater outfalls from the site along the Mulkear River and create a new stormwater drainage network with attenuation ponds and treatment draining to the River Shannon through the existing outfall. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil, Structural and Design Engineers, Quantity Surveyor, Employerโs Representative, PSDP, Assigned Certifier, Third Party co-ordinator, Ecologist and any relevant specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include if required completion of Stage 1 Planning Permission queries 2 Post Planning Submission and Detailed Design 3 Procurement and Assessment of Works Contractor 4 Construction and 5 Handover. A multi-disciplinary Technical Resource Resident Engineer will be required to be procured by the appointed Design Team and a separate appointment will be made for this.
Deadline
The time limit for receipt of tenders was 2025-04-30.
The procurement was published on 2025-03-31.
Contract notice (2025-03-31) Object Scope of the procurement
Title: Project Management (PM) Led Integrated Multi-Disciplinary Design Team Consultancy Services for Infrastructure Delivery - Flood Mitigation Work at IDA Lands National Technology Park, Co. Limerick
Short description:
โIDA previously carried out a review of the options for flood alleviation at the National Technology Park NTP Limerick. The purpose of the review was to...โ
Short description
IDA previously carried out a review of the options for flood alleviation at the National Technology Park NTP Limerick. The purpose of the review was to examine viable options to minimise the risk of ingress of flood waters to NTP from the Shannon and Mulcair and manage flood water arising from surface water run off within the park during river flood pluvial flooding. A new flood defence is necessary because the existing flood defence berm provides an insufficient level of protection and currently allows for water seepage beneath the berm through extensive granular soils. There is an existing boundary fence associated with a clientโs facility to the east of the site And this fence will be relocated further to the south to facilitate the construction of the flood defence. Due to environmental constraints identified on the Mulkear River spawning lamprey it is proposed to remove existing stormwater outfalls from the site along the Mulkear River and create a new stormwater drainage network with attenuation ponds and treatment draining to the River Shannon through the existing outfall. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil, Structural and Design Engineers, Quantity Surveyor, Employerโs Representative, PSDP, Assigned Certifier, Third Party co-ordinator, Ecologist and any relevant specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include if required completion of Stage 1 Planning Permission queries 2 Post Planning Submission and Detailed Design 3 Procurement and Assessment of Works Contractor 4 Construction and 5 Handover. A multi-disciplinary Technical Resource Resident Engineer will be required to be procured by the appointed Design Team and a separate appointment will be made for this.
Show more
Type of contract: Services
Products/services: Project management consultancy services๐ฆ
Estimated value excluding VAT: 900 000 EUR ๐ฐ
Description
Description of the procurement:
โIDA previously carried out a review of the options for flood alleviation at the National Technology Park NTP Limerick. The purpose of the review was to...โ
Description of the procurement
IDA previously carried out a review of the options for flood alleviation at the National Technology Park NTP Limerick. The purpose of the review was to examine viable options to minimise the risk of ingress of flood waters to NTP from the Shannon and Mulcair and manage flood water arising from surface water run off within the park during river flood pluvial flooding. A new flood defence is necessary because the existing flood defence berm provides an insufficient level of protection and currently allows for water seepage beneath the berm through extensive granular soils. There is an existing boundary fence associated with a clientโs facility to the east of the site And this fence will be relocated further to the south to facilitate the construction of the flood defence. Due to environmental constraints identified on the Mulkear River spawning lamprey it is proposed to remove existing stormwater outfalls from the site along the Mulkear River and create a new stormwater drainage network with attenuation ponds and treatment draining to the River Shannon through the existing outfall. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil, Structural and Design Engineers, Quantity Surveyor, Employerโs Representative, PSDP, Assigned Certifier, Third Party co-ordinator, Ecologist and any relevant specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include if required completion of Stage 1 Planning Permission queries 2 Post Planning Submission and Detailed Design 3 Procurement and Assessment of Works Contractor 4 Construction and 5 Handover. A multi-disciplinary Technical Resource Resident Engineer will be required to be procured by the appointed Design Team and a separate appointment will be made for this.
Procedure Type of procedure
Open procedure โ Administrative information
Time limit for receipt of tenders or requests to participate: 2025-04-30 00:00:00 ๐
Conditions for opening of tenders: 2025-04-30 00:30:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=5388225
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 180
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Review procedure
Precise information on deadline(s) for review procedures:
โn/aโ Information about electronic workflows
Electronic invoicing will be accepted
Source: OJS 2025/S 064-208286 (2025-03-31)