2022-12-14   Kildare Framework Agreement for Pavement and Associated Minor Works for National Roads 2023 (Kildare County Council)
The Contracting Authority wishes to establish and operate a multi-supplier Framework Agreement for the provision of pavement and associated minor works for national road schemes. The proposed number of framework contractors will be a minimum of 5 and a maximum of 10 (provided sufficient Tenderers qualify for admission to the framework). The Framework Period will be 24 months. Public bodies entitled to purchase through the Framework Agreement are the Contracting Authority (Kildare County Council), Dรบn โ€ฆ View the procurement ยป
Mentioned suppliers: Arkil Ltd David Walsh Civil Engineering Ltd Glas Civil Engineering Ltd Kilsaran Roadsurfacing And Contracting Lagan Asphalt Ltd t/a Breedon Plazamont Ltd TA Dan Morrissey & Company Priority Construction Limited Roadstone Ltd Siac Bituminous Products Ltd
2019-07-08   Liberty Square Enhancement Scheme โ€” Main Works (Tipperary County Council)
The liberty square enhancement scheme works comprise: โ€” widening of existing footpaths in liberty square and provision of pedestrian crossing points (including one controlled pedestrian crossing in liberty square), โ€” re-configuration of existing carriageway in Liberty Square (N75), โ€” removal of existing car parking spaces from Liberty Square and construction of lay-bys for parking, loading and taxi rank, โ€” construction of an off-street public car park (approx. 100 spaces) and reconfiguration of existing โ€ฆ View the procurement ยป
Mentioned suppliers: David Walsh Civil Engineering Ltd
2018-12-17   Kildare Framework Agreement for Pavement and Associated Minor Works for National Roads 2019 (Kildare County Council)
The Contracting Authority wishes to establish and operate a multi-supplier Framework Agreement for the provision of pavement and associated minor works for national road schemes. The proposed number of framework contractors will be a minimum of 5 and a maximum of 10 (provided sufficient Tenderers qualify for admission to the framework). The Framework period will be 18 months. Public bodies entitled to purchase through the Framework Agreement are the Contracting Authority (Kildare County Council), Dรบn โ€ฆ View the procurement ยป
Mentioned suppliers: Arkil Ltd David Walsh Civil Engineering Ltd Kellys of Fantane Kilsaran Lagan Asphalt Ltd Plazamont Ltd T/A Dan Morrissey and Company Priority Construction Road Maintenance Services Ltd Roadstone Ltd Siac Bituminous Products Ltd
2017-04-27   Ring Helvick Water Supply Scheme (Irish Water)
Ring Helvick Water Supply Scheme works are: Connection to the existing water supply network. new pumping station 2 No. reservoir sites Installation of a 6 150 m 250 mm rising main with surge vessel 2 No. 150 mยณ reservoirs Construction of a control building Installation of pumping plant and equipment Installation of 640 m of 125 mm OD SDR11 HDPE rising from the Lower Reservoir site to the Upper Reservoir site. Construction of 1 No. 300 mยณ reservoir Installation of 5 970 m of distribution pipework Civil โ€ฆ View the procurement ยป
Mentioned suppliers: David Walsh Civil Engineering Ltd