2023-04-28   Whitestown Remediation Project - The removal of all waste, contaminated soil and potentially contaminated soil from... (Wicklow County Council)
Works shall include but not limited to; โ€ข Site mobilisation, set up and enabling works. โ€ข Installation of environmental protection measures o surface water management o silt fence installation o installation of additional or replacement monitoring infrastructure โ€ข Staged waste excavation and removal of waste, contaminated and potentially contaminated soil (approximately 175,000m3) and associated reprofiling works โ€ข Landscaping and Fencing โ€ข Demobilisation โ€ข Post Remediation Handover Period View the procurement ยป
2016-11-21   Limerick Gasworks Remediation _Phase 2 (Soil Stabilisation/ Solidification) (Ervia)
Design of soil binder mixes and implementing Soil Stabilisation and Solidification works to contaminated soils 3 m deep over a 1.4 ha site based on this design. View the procurement ยป
2012-08-13   Limerick Former Gasworks, Pump and Treat Remediation (Bord Gais Eireann)
The contract comprises the remediation of the former Limerick Gasworks. Further to a comprehensive site investigation and quantitative risk assessment it has been identified that free product (coal tar) comprising DNAPL (Dense Non Aqueous Phase Liquid) needs to be removed from site. The remediation solution will comprise the extraction of free product by a pumping methodology with subsequent removal of DNAPL for disposal/recycling using sustainable techniques where appropriate and practically and โ€ฆ View the procurement ยป
2011-09-13   EOI for Bunratty Landbank Development Opportunity (Shannon Development Co. Ltd)
Shannon Development has developed the Bunratty Castle & Folk Park project over many years to the stage where it has now become one of the top visitor attractions in Ireland. Total Visitor numbers for the attraction have reached in excess of 400 000 per annum. The company continues to operate the attraction to a very high standard consistent with international best practice. This commitment is evident through the build / design standards adopted throughout the attraction and also through the strong โ€ฆ View the procurement ยป