2017-06-09Enabling Works Contract, Smooth Point, Killybegs Fishery Harbour Centre (Department of Agriculture, Food and the Marine)
The works will comprise the following:
Environmental dredging of approximately 24 500 cubic metres of contaminated marine sediments.
Stabilisation of the dredge material within the Fishery Harbour Centre.
Removal of the stabilised material from site for re-use or disposal.
Removal of an existing stockpile of inert clay (circa 13 000 cubic metres) from the harbour.
Putting in place all necessary waste permits, licences or permissions required to lawfully stabilise the dredged material and remove it from …
View the procurement » Mentioned suppliers:ABCO Marine (IRL) Ltd
2015-05-27Ballymun Boilerhouse Repurpose WISER (Working with Industrial Spaces to Exemplify Reuse) Life Project, Ballymun... (Dublin City Council)
The WISER (Working with Industrial Spaces to Exemplify Reuse) project brings together a broad spectrum of interrelated operations and expertise to champion the development of resource efficiency. The aim is to produce a centre to demonstrate excellence in reuse practice including the construction process. The Project seeks to lead change from waste to resource through reuse, redesign, research and education and as such it is desired that tendering contractors should illustrate experience in the …
View the procurement » Mentioned suppliers:Purcell Construction Ltd