2022-11-02   Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (โ€œOEMsโ€) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements. Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement ยป
2019-04-25   SWSOS Turbine Air Intakes Replacement (Ervia on behalf of GNI UK Limited (in which case the Contract will be with GNI UK Limited))
Contract for the design and build of 7 No. air intakes to existing gas turbines in natural gas compressor stations in 2 locations in South West Scotland. The scope includes the removal and replacement of existing air intakes for both combustion and ventilation air for 3 No. Solar Taurus 70 Turbines at the first location and 4 No. Solar Mars 100 Turbines at the second Location. The scope will include design, manufacture, supply, installation, commissioning and certification of the new air intakes. The โ€ฆ View the procurement ยป
Mentioned suppliers: Cullum Detuners Ltd
2011-02-02   Partial revision of steam turbine generator, Tarbert no. 4 (revised scope) (Endesa Ireland Ltd.)
In September 2010 a notice was published in OJEU (ref. # 2010/S 176-269048) via eTenders (ID # SEP168816) for "Revision of steam turbine generator, Tarbert no. 4. Including supply of turbine blades". As a result of a material change in scope this notice is being issued for a revised and reduced scope of work and supersedes the previous notice. Endesa Ireland wishes to invite expressions of interest for the partial revision of steam turbine generator, Tarbert no. 4. The scope of works shall include the โ€ฆ View the procurement ยป