2017-11-14   Design and Construction Services for North Apron 5H Stands Main Works (daa plc)
The successful Contractor will be required to assemble a Design and Construction team led by a Project Manager to undertake the detailed design and construction of Stand 5H and the associated infrastructure. The proposed development of Apron 5H is located in the northern part of Dublin Airport, south-east of the future North Runway (NR) and future Parallel Taxiway (FPT) and east of Apron 5G. View the procurement ยป
2014-03-11   P2108 - Airfield Pavement Construction Framework (Dublin Airport Authority plc (DAA))
The Contracting Authority proposes to appoint between 4 and 12 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield pavement construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2014 to 2017 inclusive. View the procurement ยป
2013-12-02   P2108 - Airfield Pavement Construction Framework (Dublin Airport Authority plc ( DAA ))
The Contracting Authority proposes to appoint between four (4) and twelve (12) Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield pavement construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2014 to 2017 inclusive. View the procurement ยป
2008-04-25   Airfield pavement (Dublin Airport Authority plc)
Title attributed to the contract by the contracting entity: Aircraft Pavement Rehabilitation (Framework). Shannon Airport is planning a programme of pavement rehabilitation works scheduled to commence in Autumn 2008. These will include, but not be limited to overlay and resurfacing of the existing taxiways and runway (including associated drainage and earthworks), pavement repairs and substantial modifications to and replacement of the existing AGL systems. It is currently expected that the work will be โ€ฆ View the procurement ยป