Recent procurements of intercity railway works in Ireland
2023-09-26MUTLI DISCIPLINARY CONSULTANCY FOR NAVAN LINE (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) through a single party framework requires the services of a multi-disciplinary consultant to support the the delivery of PMP Phases 1 – 6 (Project Scope and Approvals through to Construction) services for the Navan Rail Line Project. It is anticipated that the services for Phases 1-2 will be required for an initial period of 30 months with the option to extend by a period of 12 months at IÉ’s discretion, and with Phases 3-6, encompassing Preliminary Design, the Planning & Statutory …
View the procurement »
2023-02-13Glounthuane to Midleton Twin Track Construction (Iarnrod Eireann-Irish Rail)
The scope of the Glounthaune to Midleton Twin Track project is summarised below:
• Twin tracking of the single-track sections between Glounthaune and Midleton (approximately 70% of the 10km route)
• Reconfiguration of the operational track layouts, as required.
• Provision of sidings/turn back facility at Midleton.
• Provision of new cable containment routes from Glounthaune to Midleton
• Facilitation of signalling upgrades and alterations.
View the procurement »
2022-06-30TPS Safety Assurance and Human Factors PQQ (Iarnrod Eireann-Irish Rail)
IÉ is undertaking a multi annual project to replace its existing train control/warning systems with a modern Train Protection System (TPS).The specific scope of this tender is for services relating to part of the Iarnród Éireann network between the Northern Irish Border and Greystones now referred to as the Drogheda to Greystones TPS Project or “D2G”. To deliver the D2G part of the national TPS rollout Iarnród Éireann requires the following services:
• Safety Assurance Services including a Safety …
View the procurement » Mentioned suppliers:Pendyne
2022-06-20Glounthuane to Midleton Twin Track Construction (Iarnrod Eireann-Irish Rail)
• Twin tracking of the single-track sections between Glounthaune and Midleton (approximately 70% of the 10km route)
• Reconfiguration of the operational track layouts, as required.
• Provision of sidings/turn back facility at Midleton.
• Provision of new cable containment routes from Glounthaune to Midleton
• Facilitation of signalling upgrades and alterations.
• All associated works (drainage, retaining walls, boundary treatments, etc.).
View the procurement »
2022-05-19DART + PROGRAMME - BEMU INFRASTRUCTURE PROJECT (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IÉ) have made the first order of Battery Electric Multiple Unit (BEMU) trains to decarbonise public transport via replacement of some diesel services. For BEMUs to operate successfully, charging facilities are required to recharge the batteries and interventions are required to stabling and depot maintenance facilities.
View the procurement » Mentioned suppliers:Alstom Transport
2022-05-18LONG TERM SUPPLY AND SUPPORT OF A COMPUTER BASED INTERLOCKING SYSTEM (Iarnrod Eireann-Irish Rail)
IÉ are seeking to install a Computer Based Interlocking (CBI) Cabinet that contains the interlocking logic which processes the route setting activity based on the dispatcher command, and the control of the trackside with the corresponding level of safety.
Object Controllers (OC) that monitor and control trackside objects are also required.
Lineside Electronic Units (LEU) may be required as a part of this tender.
This contract will run for circa 25 years
View the procurement »
2022-04-29SIGNALLING & TELECOMMUNICATIONS UPGRADE (DESIGN & BUILD) FOR THE CORK AREA COMMUTER RAIL (CACR) PROJECT (Iarnrod Eireann-Irish Rail)
This is a call to competition by IE for suitably qualified companies to participate in the pre-qualification process for the proposed tender for the Signalling & Telecommunications Upgrade ( Design & Build) for the Cork Area Commuter Rail ( CACR) project.
The overarching Cork Area Commuter Rail (CACR) programme comprises the heavy rail elements of CMATS. The programme objective is to deliver a transformative higher capacity, higher frequency unified through running suburban rail service for citizens …
View the procurement » Mentioned suppliers:Alstom Transport UK
2021-09-24Cork Line Level Crossings & Elimination Works (Irish Rail)
This is a call to competition by IE to award a contract for the elimination/upgrade of six existing level crossings on the Dublin to Cork Railway Line between Limerick Junction and Mallow Stations.
Planned proposals for the elimination/de-manning of these level crossings include:
(a) full closure (extinguishment of the public right of way across the level crossing),
(b) provision of alternative access across the railway line through the construction of an access road and/or overbridge.
A specific design …
View the procurement »
2021-04-15Coastal Infrastructure Protection Programme-Multi-Disciplinary Consultant Services (Iarnrod Eireann-Irish Rail)
The Coastal Infrastructure Protection Programme (CIPP) (subject of this contracts being procured) is part of the Dublin to Rosslare Railway line environs. The CIPP will provide for enhanced climate resilience to the railway infrastructure network. IE wishes to procure a multi-disciplinary consultant to undertake the preparation of the project design, statutory approval processes and construction supervisor to project and programme closeout for the CIPP programme.
View the procurement » Mentioned suppliers:Jacobs Engineering Ireland Ltd
2016-02-18Sandyford Depot Extension Works (Transport Infrastructure Ireland (TII))
The Employer requires a contractor with expertise in civil engineering, structural engineering, building works, building services, traction power and overhead conductor system engineering works and track works for the purposes of carrying out the following activities.
View the procurement »
2014-03-12CCE5236 - Framework Agreement for Civil Engineering & Building Works (Iarnrod Eireann-Irish Rail)
Framework Agreement for Civil Engineering and Building Works associated with the upgrading of the Railway Infrastructure and any other Works which IE or CIE may undertake on their properties. Each project valued from EUR 100,000 up to and not exceeding EUR 500,000 excluding VAT. This framework agreement will operate for a period of 3 years with the option to extend for an additional year. For further information please download and review the attached Pre- Qualification Questionnaire (PQQ).
View the procurement »
2013-11-14NW5062 - Signalling, Telecoms and OHLE Works for CCRP Phase 3 (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (Irish Rail) is seeking expressions of interest from suitably qualified contractors with experience of complex railway system projects for the installation of Signalling, Telecoms and Overhead Line Equipment (OHLE) for Phase 3 of the City Centre Re-Signalling Project.
The City Centre Re-Signalling Project (CCRP) is a strategic re-signalling project covering the DART network in Dublin. The project is divided into four phases for ease of management and control. Phases 1 & 2 are now nearing …
View the procurement »
2013-11-08NW5062 - Signalling, Telecoms and OHLE Works for CCRP Phase 3 (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (Irish Rail) is seeking expressions of interest from suitably qualified contractors with experience of complex railway system projects for the installation of Signalling, Telecoms and Overhead Line Equipment (OHLE) for Phase 3 of the City Centre Re-Signalling Project.
The City Centre Re-Signalling Project (CCRP) is a strategic re-signalling project covering the DART network in Dublin. The project is divided into four phases for ease of management and control. Phases 1 & 2 are now nearing …
View the procurement »
2013-09-24NW5062 - Signalling, Telecoms and OHLE Works for CCRP Phases 3 & 4 (Iarnrod Eireann-Irish Rail)
IE is seeking expressions of interest from suitably qualified contractors with experience of complex railway system projects for the carrying out of Signalling, Telecoms and Overhead Line Equipment (OHLE) works required for Phase 3 of the City Centre Re-Signalling Project.
The City Centre Re-Signalling Project (CCRP) is a strategic re-signalling project covering the DART network. The project is divided into four interrelated phases for ease of management and control. Phases 3 & 4 are a continuation of …
View the procurement »
2013-05-09CCE 4944 - Framework Agreement for Civil Engineering and Building Works (Iarnrod Eireann-Irish Rail)
Civil Engineering and Building Works associated with the upgrading of the Railway Infrastructure and any other Works which IE or CIE may undertake on their properties. Each project valued from EUR 100 000 up to and not exceeding EUR 500 000 excluding VAT. This Framework Agreement will operate for a period of 3 years with the option to extend for an additional year. For further information please download and review the attached Pre- Qualification Questionnaire (PQQ).
View the procurement »
2013-04-24CCE 4930 - Framework Agreement for Small Civil Engineering and Building Works (Iarnrod Eireann-Irish Rail)
Small Civil Engineering and Building Works associated with the upgrading of the railway infrastructure and any other Works which IE or CIE may undertake on their properties. Each project valued at up to 100 000 EUR excluding vat. This Framework Agreement will operate for a period of 3 years with the option to extend for an additional year. For further information please download and review the attached Pre Qualification Questionnaire ( PQQ)
View the procurement »