2023-10-04   EST_MW_Refurbishment to Buildng (Doctor's Hse) at Ennis Hospital (Health Service Executive HSE)
Refurbishment works to building known as the "The Doctor's Residence" on the grounds of Ennis General Hospital consisting of removal of existing finishes and stripping out electrical installation; painting. floor finishes, electrical installation and refurbishment of existing windows. View the procurement »
2023-09-25   EST_Rapid Build Surgical Hubs in Cork, Limerick and Waterford (Health Service Executive HSE)
i) Development of up to three permanent Surgical Services Hubs to be located on Health Service Executive (“HSE”) owned sites in Limerick, Cork and Waterford. ii) The HSE is initiating this tender competition in order to identify an economic operator with capability and experience develop up to three surgical services hubs to HSE specifications using rapid build construction technology. iii) The Contracting Authority requires each of the surgical hubs to be delivered as soon as possible. However, there … View the procurement »
2023-09-25   EST_Rapid Build Surgical Hubs in Cork, Limerick and Waterford (Health Service Executive HSE)
i) Development of up to three permanent Surgical Services Hubs to be located on Health Service Executive (“HSE”) owned sites in Limerick, Cork and Waterford. ii) The HSE is initiating this tender competition in order to identify an economic operator with capability and experience develop up to three surgical services hubs to HSE specifications using rapid build construction technology. iii) The Contracting Authority requires each of the surgical hubs to be delivered as soon as possible. However, there … View the procurement »
2023-08-31   The National Maternity Hospital at St. Vincent's University Hospital Campus - WORKS CONTRACTOR and PSCS (Health Service Executive HSE)
The proposed development comprises the construction of The National Maternity Hospital at St. Vincent’s University Hospital campus, Elm Park, Dublin 4. The proposed new National Maternity Hospital building will be located at the eastern side of the hospital campus and comprises the construction of a building that rises to seven (7) storeys above ground level, with one partial basement level, plus additional ancillary plant areas on the roof level, giving an overall height of 42.300m. The gross floor area … View the procurement »
2023-05-31   EST WORKS - Development and Lease of Surgical Services Hub in the North Dublin Area (Health Service Executive HSE)
Development of a surgical services hub on the tenderer’s land and/or building to be leased to the Health Service Executive (“HSE”) in the North Dublin Area. The HSE is initiating this tender competition in order to identify an economic operator with suitable lands and/or building and the capability to develop a surgical services hub to HSE specifications on the same land and/or building and lease it to the HSE. It is anticipated that that term of the lease will be circa 25 years from the completion of … View the procurement »
2022-07-14   Turnkey Specialist Facilities for new children’s hospital at St James’s Hospital Campus, Dublin 8 (National Paediatric Hospital Development Board)
The proposed works requirements will consist of the construction and fit-out of four separate Turnkey Specialist facilities with a total area of approximately 500sqm located throughout the new children’s hospital which is currently under construction on the site of the St James’s Hospital, Dublin 8. 1) Provision of Biosafety Laboratory 2) Provision of Stem Cell HSCT Laboratory. 3) Provision of Radio Pharmacy Aseptic Compounding Unit (RACU) 4) Provision of Pharmacy Aseptic Compounding Unit (ACU) Responses … View the procurement »
2022-07-14   Enabling + Advanced Works - NMH @ SVUH Campus (Health Service Executive (HSE))
Single Operator Framework for Enabling + Advanced Works - NMH @ St. Vincent's University Hospital Campus. View the procurement »
2021-08-06   INTENSIVE CARE UNIT AT ST.VINCENT'S UNIVERSITY HOSPITAL (St Vincent's University Hospital)
Construction of a new elevated 3 storey building adjacent to the existing Emergency Department. The building will consist of 10 ICU beds and 4 ICU isolation lobbies on Level 1 (First Floor) with office accommodation and both internal and screened external plant areas at Level 2 (Second Floor). View the procurement »
2018-11-02   Framework of Design and Build Modular Building Contractors for the Ireland East Hospital Group and its Constituent Hospitals (Mater Misericordiae University Hospital Ltd)
The Ireland East Hospital Group (IEHG) envisages a requirement for modular buildings on a number of its hospital sites over the coming years. In order to facilitate this requirement the IEHG is establishing a framework of design and build modular building providers. The modular building provider will be required to provide the design team and work specialists as laid out in this PQQ documentation. The framework will be established for a period of 48 months. Requirements will be drawn down by way of … View the procurement »
2018-06-26   Minor Building Works — HSE Acute Hospital Environments (Health Service Executive (HSE))
The HSE as Contracting Authority is coordinating the establishment of a Framework Agreement of Minor Building Works Contractors for acute hospital environments. View the procurement »
Mentioned suppliers: See successful applicants file on the...
2018-01-05   Establishment of a Single Operator Framework for Enabling Works; The National Maternity Hospital at St Vincent's... (Health Service Executive (HSE))
The works relate to the creation of a single operator to deliver a series of enabling works in connection with The NMH relocation to the campus of SVUH. Such works will include but are not limited to, the following: 1) The provision of temporary service supplies including laboratory gases, N2O, LTHW, etc., and all associated works; 2) The provision of permanent service supplies including M, LV, FA, Oil, NG, Comms, etc., and all associated works; 3) Decommissioning of existing services and associated … View the procurement »
2017-02-22   Pharmacy and Car park Works at St. Vincent's University Hospital (St Vincent's University Hospital)
The Pharmacy The proposed development will consist of the construction of a new pharmacy facility. The works include the provision of a Pharmacy Automated Dispensing system within the New Pharmacy Building. The installation of a New Pharmacy Aseptic Compounding Unit (ACU) within the New Pharmacy Building. The ACU is approximately 210 sq. m and will provide clean room facilities capable of operating to Grade B. The ACU comprises, Prep Room, Compounding Room, 2 x Changing Rooms, Aseptics Office, Aseptics … View the procurement »
2015-09-23   Suitability Assessment Process for: Works Contractor and Project Supervisor for the Construction Stage for the new... (National Paediatric Hospital Development Board)
The NPHDB wishes to procure 2 satellite centres at Tallaght Hospital campus and Connolly Hospital campus, in addition to the new children's hospital at St James's Hospital campus (which itself is being separately procured). The scope of the new children's hospital satellite centres in broad terms comprises of: View the procurement »
Mentioned suppliers: Bam Building Ltd
2015-05-25   HSE West (Galway, Mayo and Roscommon Area) — Building Contractors Framework: 500 000 — 5 000 000 (Health Service Executive (HSE))
HSE West (Galway, Mayo and Roscommon) is seeking to Establishment a Framework (500 000 EUR — 5 000 000 EUR) of suitable building contractors for refurbishment, extensions and buildings works required for a number of their acute and non-acute Healthcare buildings and structures located throughout Galway, Mayo and Roscommon. These building works will be carried out in a live operational hospital / healthcare buildings which include all the associated health and safety requirements including dust / … View the procurement »
2011-02-11   NUIG/BUILD/030/10; Design and build contractor for research bundle project at NUI Galway (National University of Ireland, Galway)
NUI Galway is embarking on an ambitious plan to rapidly develop suitable accommodation and facilities to enhance research and innovation. It is required that these facilities are ready to operate fit-for-purpose by September 2012. To this end, the NUI Galway is seeking innovative methods of procurement, value management, briefing and construction to meet this deadline. The NUI Galway Research Bundle project will comprise the construction of a bundle of three (3) separate buildings as follows; 1. A … View the procurement »
Mentioned suppliers: J J Rhatigan & Company