2023-10-23   GWM14870 Framework Agreement to Complete Generator Rotor Removal, Inspection, Electrical Testing and... (Electricity Supply Board ESB)
GWM14870 Framework Agreement for Contractor/Service Provider to provide Resources/Manpower, Tooling and Test Equipment to Complete Generator Rotor Removal, Inspection, Electrical Testing and Generator/Turbine Realignment of Two Hydro Units at Electricity Supply Board (ESB) Ardnacrusha Generating Station Located in the Republic of Ireland. View the procurement »
2022-11-02   Provision of a Framework Agreement for Turbine Supply and Long-Term Service Agreements for FuturEnergy Ireland (FuturEnergy Ireland Development DAC)
FuturEnergy Ireland invites expressions of interest from Original Equipment Manufacturers (“OEMs”) for inclusion on a Framework Agreement for Turbine Supply in respect of a significant pipeline of wind development projects and the associated long term service arrangements. Please find attached our expression of interest document which provides a detailed explanation of this tender process and our specific requirements from candidates in respect of this expression of interest stage. View the procurement »
2022-07-13   FW Supply & Delivery Wind Turbine Components Ireland 1228 (SSE Renewables Wind Farms (Ireland) Limited)
SSE Renewables Windfarms (Ireland) Limited intends to award framework agreements (“Agreements”) for the supply and delivery of new and refurbished wind turbine components. View the procurement »
2021-11-10   Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
Mentioned suppliers: Vestas
2021-09-27   Selection of Supplier for Turbine Supply Contract for Derrinlough Wind Farm (Bord Na Mona)
Expressions of interest are invited from suitably qualified candidates interested in being considered for the selection of Supplier for Wind Turbine supply contract for Derrinlough Wind Farm. Bord Na Móna Powergen Limited, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 21 wind turbine generators and associated infrastructure on a c. 23601908 Ha site spanning Clongawny and Drinagh Bogsin Co Offaly. It is intended that the wind farm will be developed following … View the procurement »
2021-01-21   Supply, Installation and Commissioning of Wind Turbines for Derryadd Wind Farm (Bord Na Mona)
Bord Na Móna Powergen Ltd, a wholly owned subsidiary of Bord Na Mona plc, intends to construct a wind farm consisting of 24 wind turbine generators and associated infrastructure on a c.1908 Ha site spanning Derryadd, Derryaroge and Lough Bannow bogs located approximately 2 km east of the town of Lanesborough and 9 km south west of Longford Town in south County Longford, Ireland. It is intended that the wind farm will be developed following a successful bid into a Renewable Electricity Support Scheme … View the procurement »
2020-05-27   Service and Availability Agreements for ESB Windfarms in Ireland and UK (Electricity Supply Board (ESB))
ESB is seeking tenders for the provision of Wind Turbine Service and availability agreements for 8 Windfarms which total 202 MW of wind turbines in Ireland and the UK. View the procurement »
2020-05-04   OO Supply and Install – WTG’s Yellow River and Tangy WF — 0224 (Green Wind Energy (Wexford) Ltd)
This contract notice is issued to tenderers for supply, installation and commissioning services for wind turbine generators (WTG) at Yellow River (Lot 1) and Tangy (Lot 2) Wind Farms, which will include but not be limited to the following: • complete manufacture and supply of entire WTG system; • transport and delivery (including to site and on-site movements) of the same including any specialist lifting equipment; • design of foundation loadings; • installation of WTG, commissioning of WTG; • potential … View the procurement »
2019-11-25   Wind Turbines Supply for Oweninny Phase 2 Wind Farm (Oweninny Power 2 DAC)
wind turbines supply, erection and long term maintenance services and availability for Oweninny Phase 2 wind farm. View the procurement »
Mentioned suppliers: Nordex Energy Ireland
2018-11-21   Panel for Provision of Training Services (IWEA (The Irish Wind Energy Association))
The objective of this RFT is to establish a panel of qualified trainers from which providers will be selected to participate in a mini-competition for contract award for the design and delivery of various training programmes to the Green Tech Skillnet in 2019. View the procurement »
2014-12-03   Turbine Supply and Long Term Service Agreements for the Coillte Cullenagh Windfarm Project (Coillte Teoranta)
Coillte invites expressions of interest for Turbine Supply and Long Term Service Agreements for its Cullenagh Windfarm Project. Further details of requirements can be viewed on the 2 documents attached to this notice. 1. Expression of interest document, 2. Pre-Qualification Questionnaire. Please take note of the requirements stated in the above documents and the deadline date for receipt of submissions. View the procurement »
2013-12-12   Turbine Supply and Long Term Service Agreements for the Coillte Sliabh Bawn Wind Farm Project (Coillte)
Coillte wishes to invite expressions of interest for turbine supply and long term service agreements in relation to its Sliabh Bawn wind farm project. Further information is available in the following documents which are attached to this notice: 1. Expression of Interest document. 2. Pre Qualification Questionaire document. In order to be considered for this competition candidates must complete the pre qualification questionnaire requirements and return by the deadline date stated. View the procurement »
2013-08-02   RT13_033 - Multi Supplier Framework for Wind Turbine Generator Operation, Maintenance & Services of Bord Gais... (Bord Gais Eireann)
Bord Gáis Energy is undertaking a competitive tendering process, seeking to enter into Multi Supplier Framework Agreements for Wind Turbine Generator Operation, Maintenance and Service of Bord Gais (Energy) Windfarms. The wind farms for which this service is required is subdivided into 3 Lots with a separate submission and Multi Supplier Framework established for each Lot. Details of each Lot as follows: Lot A: 18no. Vestas V90 2MW Wind Turbine Generators located at Lisheen, Moyne, Thurles, Co. … View the procurement »
2012-06-29   IDA 500KW Wind Turbine DBOM Project Mullagharlin Dundalk, Co. Louth (IDA Ireland)
It is IDA Ireland's intention to erect a 500KW Wind Turbine at IDA Mullagharlin land bank, Dundalk Co. Louth. The successful Applicant will be appointed as the Merchant Wind Developer with resposibility for design, installation, operation and maintainenance of the proposed 500KW wind turbine at IDA Irelands Mullagharlin Business Park in Dundalk, Co. Louth. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at … View the procurement »
2012-05-21   FÁS: decommissioned wind turbin equipment for training purposes in Tralee training (FAS - Foras Aiseanna Saothair,Training and Employment Authority)
FÁS - Foras Áiseanna Saothair. FÁS was originally established as The Training and Employment Authority under the Labour Services Act 1987. Arising from a Government decision, it is expected that FÁS will be dissolved following the enactment of relevant legislation. SOLAS will be established as a new organisation to plan, coordinate and fund further education and training. The direct training provision of FÁS will subsequently be transferred to new Education and Training Boards (reconstituted Vocational … View the procurement »
2011-03-03   Multi supplier framework for wind turbine contracts relating to bord gais wind farm developments (Bord Gais Eireann)
The anticipated scope applicable to the framework includes but is not limited to the following works: — Wind turbine generator supply and commission including associated turbine electrical works and SCADA system. The client may also require any one or combination of, the following additional services under the framework. — Wind turbine foundation design, — Wind turbine foundation construction including concrete bases, excavation to suitable formation level and build up to the required level, — Complete … View the procurement »
Mentioned suppliers: Enercon Gmbh Gamesa Eolica S.L.U. Nordex Uk Ltd Siemens Ltd Vestas