IDA Strategic Property Team recently carried out an Area Based Traffic and Transport Assessment in Raheen to determine the key infrastructure measures required in Raheen Industrial Estate and its wider infrastructure network to tackle existing and future constraints in transport capacity to plan for future levels of development to facilitate projected growth in population and employment and to cater for and encourage sustainable mobility. Following on from this study, IDA Strategic Property Team is now seeking to appoint a Project Management Led Integrated Team to undertake and provide a site wide Mobility Management Plan. The Project Management led Design Team will manage and provide all relevant consultancy services with respect to the study, analysis of findings and future recommendations in relation to the Mobility Management Plan. In line with IDAs current strategy Adapt Intelligently A Strategy for Sustainable Growth and Innovation 2025-29, delivery of this project aims to assist in reducing IDA Ireland client carbon emissions. The study shall be informed by the emerging Transport Strategy for the Park which outlines multi modal short, medium and longterm solutions to enable sustainable growth. The appointed Consultant should consist of suitably qualified and experienced resources which can cover strategic planning, stakeholder engagement, behavioural change, and technical delivery. Key personnel should include, Project Director Manager, Transport Planner, Mobility Management Specialist, Stakeholder Engagement Lead, Data Analyst GIS Specialist and any specialist advisors required for the successful delivery of the project.
Deadline
The time limit for receipt of tenders was 2025-10-07.
The procurement was published on 2025-09-09.
Contract notice (2025-09-09) Object Scope of the procurement
Title: Project Management Led (PM) Multi Disciplinary Team for MMP Raheen
Short description:
โIDA Strategic Property Team recently carried out an Area Based Traffic and Transport Assessment in Raheen to determine the key infrastructure measures...โ
Short description
IDA Strategic Property Team recently carried out an Area Based Traffic and Transport Assessment in Raheen to determine the key infrastructure measures required in Raheen Industrial Estate and its wider infrastructure network to tackle existing and future constraints in transport capacity to plan for future levels of development to facilitate projected growth in population and employment and to cater for and encourage sustainable mobility. Following on from this study, IDA Strategic Property Team is now seeking to appoint a Project Management Led Integrated Team to undertake and provide a site wide Mobility Management Plan. The Project Management led Design Team will manage and provide all relevant consultancy services with respect to the study, analysis of findings and future recommendations in relation to the Mobility Management Plan. In line with IDAs current strategy Adapt Intelligently A Strategy for Sustainable Growth and Innovation 2025-29, delivery of this project aims to assist in reducing IDA Ireland client carbon emissions. The study shall be informed by the emerging Transport Strategy for the Park which outlines multi modal short, medium and longterm solutions to enable sustainable growth. The appointed Consultant should consist of suitably qualified and experienced resources which can cover strategic planning, stakeholder engagement, behavioural change, and technical delivery. Key personnel should include, Project Director Manager, Transport Planner, Mobility Management Specialist, Stakeholder Engagement Lead, Data Analyst GIS Specialist and any specialist advisors required for the successful delivery of the project.
Show more
Type of contract: services
Products/services: Project management consultancy services๐ฆ
Estimated value excluding VAT: 150 000 EUR ๐ฐ
Description
Description of the procurement:
โIDA Strategic Property Team recently carried out an Area Based Traffic and Transport Assessment in Raheen to determine the key infrastructure measures...โ
Description of the procurement
IDA Strategic Property Team recently carried out an Area Based Traffic and Transport Assessment in Raheen to determine the key infrastructure measures required in Raheen Industrial Estate and its wider infrastructure network to tackle existing and future constraints in transport capacity to plan for future levels of development to facilitate projected growth in population and employment and to cater for and encourage sustainable mobility. Following on from this study, IDA Strategic Property Team is now seeking to appoint a Project Management Led Integrated Team to undertake and provide a site wide Mobility Management Plan. The Project Management led Design Team will manage and provide all relevant consultancy services with respect to the study, analysis of findings and future recommendations in relation to the Mobility Management Plan. In line with IDAs current strategy Adapt Intelligently A Strategy for Sustainable Growth and Innovation 2025-29, delivery of this project aims to assist in reducing IDA Ireland client carbon emissions. The study shall be informed by the emerging Transport Strategy for the Park which outlines multi modal short, medium and longterm solutions to enable sustainable growth. The appointed Consultant should consist of suitably qualified and experienced resources which can cover strategic planning, stakeholder engagement, behavioural change, and technical delivery. Key personnel should include, Project Director Manager, Transport Planner, Mobility Management Specialist, Stakeholder Engagement Lead, Data Analyst GIS Specialist and any specialist advisors required for the successful delivery of the project.
Procedure Type of procedure
Open procedure โ Administrative information
Time limit for receipt of tenders or requests to participate: 2025-10-07 00:00:00 ๐
Conditions for opening of tenders: 2025-10-07 00:30:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=6497376
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 180
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Service from which information about the review procedure may be obtained
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Information about electronic workflows
Electronic invoicing will be accepted
Electronic ordering will be used
Electronic payment will be used
Source: OJS 2025/S 174-592834 (2025-09-09)
Contract award notice (2026-04-16) Object Scope of the procurement
Estimated value excluding VAT: 150 000 EUR ๐ฐ
Total value of the procurement (excluding VAT): 94939.16 EUR ๐ฐ
Award criteria
Quality criterion (name): 70:30
Quality criterion (weighting): 100
Award of contract
A contract/lot is awarded โ
Lot Identification Number: LOT-0001
Contract Number: 439441
Date of conclusion of the contract: 2025-12-22 ๐
Information about tenders
Number of tenders received by electronic means: 6
Information on value of the contract/lot (excluding VAT)
Total value of the contract/lot: 94939.16 EUR ๐ฐ
Name and address of the contractor
Name: AECOM Ireland Ltd_31745
National registration number: 315981
Postal address: 4th Floor, One Burlington Plaza Burlington Road Dublin 4, D04 RH96
Postal code: D04 RH96
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: susan.gregg@aecom.com๐ง
Phone: +35316966220๐
Contracting authority Type of the contracting authority
Ministry or any other national or federal authority
Source: OJS 2026/S 076-266569 (2026-04-16)