The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; 49 m west span, 68 m centre span, 57 m east span, provided square to the river. The bridge comprises a pair of steel boxes made composite with a precast and Insitu reinforced concrete deck. The western span crosses the Dublin to Rosslare Railway Line, the central span over the River Slaney and the eastern span over the River Slaney floodplain and woodland area.
Deadline
The time limit for receipt of tenders was 2020-04-02.
The procurement was published on 2020-02-05.
Object Scope of the procurement
Title:
โEnniscorthy Flood Defence Scheme โ River Slaney Road Bridge and Approaches
8/SP/2020โ
Products/services: Road bridge construction work๐ฆ
Short description:
โThe scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of...โ
Short description
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; 49 m west span, 68 m centre span, 57 m east span, provided square to the river. The bridge comprises a pair of steel boxes made composite with a precast and Insitu reinforced concrete deck. The western span crosses the Dublin to Rosslare Railway Line, the central span over the River Slaney and the eastern span over the River Slaney floodplain and woodland area.
Show more
Estimated value excluding VAT: EUR 14 000 000 ๐ฐ
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; 49 m west span, 68 m centre span, 57 m east span, provided square to the river. The bridge comprises a pair of steel boxes made composite with a precast and Insitu reinforced concrete deck. The western span crosses the Dublin to Rosslare Railway Line, the central span over the River Slaney and the eastern span over the River Slaney floodplain and woodland area.
Show more Award criteria
Quality criterion (name): Quality
Quality criterion (weighting): 70 %
Price (weighting): 30 %
Scope of the procurement
Estimated total value excluding VAT: EUR 14 000 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 18
Procedure Type of procedure
Restricted procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2020-04-02
16:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: High Court
Postal address: The Four Courts, Inns Quay
Postal town: Dublin 7
Country: Ireland ๐ฎ๐ช
Source: OJS 2020/S 027-060525 (2020-02-05)