2025-10-08   Tipperary County Council Multi-party Framework Agreement for Pavement and Associated Works 2026 (Tipperary County Council)
Tipperary County Council Multi-party Framework Agreement for Pavement and Associated Works 2026 The Framework will be established initially for 12 months with the option to extend for a further 2 periods of 12 months. View the procurement ยป
2021-05-19   Enniscorthy Flood Defence Scheme โ€“ River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; โ€ฆ View the procurement ยป
2020-02-05   Enniscorthy Flood Defence Scheme โ€“ River Slaney Road Bridge and Approaches (Wexford County Council)
The scheme is to provide a bridge structure, south of Enniscorthy town centre, that is required to provide a connection between the N11 on the east side of the River Slaney and the N30 on the west side of the river. The works will include the construction of a new road bridge, approach ramps, roundabouts, retaining walls, working adjacent to and over a live rail line and working adjacent to and over the River Slaney. The bridge comprises a 3 span arrangement with the following approximate span lengths; โ€ฆ View the procurement ยป