Design and Construction Services for North Apron 5H Stands Main Works

daa plc

The successful Contractor will be required to assemble a Design and Construction team led by a Project Manager to undertake the detailed design and construction of Stand 5H and the associated infrastructure. The proposed development of Apron 5H is located in the northern part of Dublin Airport, south-east of the future North Runway (NR) and future Parallel Taxiway (FPT) and east of Apron 5G.

Deadline
The time limit for receipt of tenders was 2017-12-14. The procurement was published on 2017-11-14.

Who?

What?

Where?

Procurement history
Date Document
2017-11-14 Contract notice