15/159 โ€” Ballyshannon Regional Water Supply Scheme Contract No 1 โ€” Water Treatment Plant and Primary Network Design Build Operate Contract

Ervia

Irish Water is currently advancing the Ballyshannon Regional Water Supply Scheme Design Build Operate Contract comprising the construction of an intake structure at Lough Assaroe, pumping station, new WTP at Knader, storage reservoir(s) including all interconnecting pipework and some trunk/distribution mains.
The works required under the contract are to be delivered on a Contractor Design- Build-Operate basis. The DBO contract is 24 months D-B with a 7 year Operation and Maintenance period, with an optional add on for up to 3 years. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.

Deadline
The time limit for receipt of tenders was 2016-03-15. The procurement was published on 2016-02-10.

Who?

What?

Where?

Procurement history
Date Document
2016-02-10 Contract notice
2016-03-18 Additional information
2016-03-29 Additional information