Recent procurements where the supplier D Copeland Engineering Ltd is mentioned
2019-08-16Fabrication of Steel Support Shaft and Hubs for Vertical Access Turbine (Design Pro Ltd)
DesignPro requires the fabrication of 2 x shaft + hub assemblies to support its vertical access hydrokinetic turbine. The units to be built are large steel structures that require precision machining and subsequent precision assembly of these components by welding and bolting. There is a short fabrication time frame required to meet company deadlines. The units must be completed and ready for collection by mid-September 2019. The overall dimensions are 6 meters tall and 2,5 meters wide. The central shaft โฆ
View the procurement ยป Mentioned suppliers:D Copeland Engineering Ltd