2012-12-21   Ringsend Waste Water Treatment Works Extension Project - Long Sea Outfall Tunnel (Dublin City Council)
The design and construction/execution of a โ€˜treated effluent' marine outfall system from the Ringsend Waste Water Treatment Works (WwTW) to the Irish Sea in Dublin Bay including: - A c. 9 km Long Sea Outfall Tunnel (LSOT), c. 5m internal diameter, constructed in bedrock; - An inlet shaft located onshore with an internal diameter of c. 20 m and up to 110 m deep. - A c. 4 m diameter offshore marine riser shaft terminating in a โ€˜treated effluent' diffuser head structure located in marine water depths of 25 โ€ฆ View the procurement ยป
2010-01-16   Construction work (National Paediatric Hospital Development Board)
Title attributed to the contract by the contracting authority: Demolition, enabling, basement and PSCS works at the National Paediatric Hospital Site, Dublin 2. Demolition, geothermal borehole, secant and diaphragm wall, piling, enabling works, basement construction works and project supervisor construction stage within the meaning of the Safety, Health and Welfare at Work (Construction) Regulations 2006, as amended. To register your interest in this notice and obtain any additional information please โ€ฆ View the procurement ยป