Recent procurements of offshore fabrication work in Ireland
2022-02-02Marine Substructures Supply, Transport & Installation (Sure Partners Limited)
Arklow Bank Wind Park Phase 2 (“Project”) is an offshore wind farm located approximately 6km to 15km off the coast of Arklow, Co. Wicklow and covers an area approximately 27km long and 2.5km wide. The Project will have a Maximum Export Capacity (MEC) of up to 800MW and will consist of up to approximately 62 turbines and will participate in Ireland’s first Offshore auction in late 2022 / early 2023.
View the procurement »
2022-02-02Inter Array Cables Supply, Transport & Installation (Sure Partners Limited)
Arklow Bank Wind Park Phase 2 (“Project”) is an offshore wind farm located approximately 6km to 15km off the coast of Arklow, Co. Wicklow and covers an area approximately 27km long and 2.5km wide. The Project will have a Maximum Export Capacity (MEC) of up to 800MW and will consist of up to approximately 62 turbines and will participate in Ireland’s first Offshore auction in late 2022 / early 2023.
View the procurement »
2022-02-02Marine Substructures Transport & Installation (Sure Partners Limited)
Arklow Bank Wind Park Phase 2 (“Project”) is an offshore wind farm located approximately 6km to 15km off the coast of Arklow, Co. Wicklow and covers an area approximately 27km long and 2.5km wide. The Project will have a Maximum Export Capacity (MEC) of up to 800MW and will consist of up to approximately 62 turbines and will participate in Ireland’s first Offshore auction in late 2022 / early 2023.
View the procurement »
2022-02-02Wind Turbine Generator Substructure Supply (Sure Partners Limited)
Arklow Bank Wind Park Phase 2 (“Project”) is an offshore wind farm located approximately 6km to 15km off the coast of Arklow, Co. Wicklow and covers an area approximately 27km long and 2.5km wide. The Project will have a Maximum Export Capacity (MEC) of up to 800MW and will consist of up to approximately 62 turbines and will participate in Ireland’s first Offshore auction in late 2022 / early 2023.
View the procurement »
2012-12-21Ringsend Waste Water Treatment Works Extension Project - Long Sea Outfall Tunnel (Dublin City Council)
The design and construction/execution of a ‘treated effluent' marine outfall system from the Ringsend Waste Water Treatment Works (WwTW) to the Irish Sea in Dublin Bay including:
- A c. 9 km Long Sea Outfall Tunnel (LSOT), c. 5m internal diameter, constructed in bedrock;
- An inlet shaft located onshore with an internal diameter of c. 20 m and up to 110 m deep.
- A c. 4 m diameter offshore marine riser shaft terminating in a ‘treated effluent' diffuser head structure located in marine water depths of 25 …
View the procurement »