Recent procurements of construction work for airfields in Ireland
2019-04-25Airfield Civil Contractors Framework 2019+ (daa plc)
Dublin Airport wishes to appoint a framework of experienced main civil contractors as long term partners (2019 to 2024) to assist in the delivery of particular “Airfield” projects (see attached RFI) forming part of the approved PACE works and submitted CIP 2020–2024 works.
Dublin Airport are seeking to enter into a collaborative approach with suitably qualified civil contractors to facilitate the delivery of these works, which we have bundled into 2 distinct packages (Lot 1 and Lot 2).
This RFI seeks to …
View the procurement »
2017-11-14Design and Construction Services for North Apron 5H Stands Main Works (daa plc)
The successful Contractor will be required to assemble a Design and Construction team led by a Project Manager to undertake the detailed design and construction of Stand 5H and the associated infrastructure. The proposed development of Apron 5H is located in the northern part of Dublin Airport, south-east of the future North Runway (NR) and future Parallel Taxiway (FPT) and east of Apron 5G.
View the procurement »
2014-03-11P2108 - Airfield Pavement Construction Framework (Dublin Airport Authority plc (DAA))
The Contracting Authority proposes to appoint between 4 and 12 Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield pavement construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2014 to 2017 inclusive.
View the procurement »
2013-12-02P2108 - Airfield Pavement Construction Framework (Dublin Airport Authority plc ( DAA ))
The Contracting Authority proposes to appoint between four (4) and twelve (12) Candidates onto a Framework Panel on a nonexclusive basis, from which Tenders will be invited for airfield pavement construction projects which are planned to be undertaken at Dublin and Cork Airports over a 4 year period from 2014 to 2017 inclusive.
View the procurement »
2012-03-21New runway end safety areas at Kerry Airport (Kerry Airport PLC)
The main works subject to this contract contain the following:
— Threshold 26 relocation,
— CAT I approach lighting system relocation,
— Eastern RESA extension to approximately 150mx240m,
— Western RESA extension to approximately 150mx240m,
— Construction of concrete box to channel open drain,
— Construction of Eastern runway turn pad extension,
— Construction of Western runway turn pad extension,
— Installation of runway guard lights,
— Relocation of PAPI,
— Relocation of glide path,
— Reparation of …
View the procurement »