2025-06-25   9436 Replacement 38kV Transaction Transformer (Iarnrod Eireann-Irish Rail)
Irish Rail are seeking to replace a transformer at our Dalkey Substation with an equivalent transformer that must have a design life of 30 years as a minimum. The proposed Transaction Transformer must meet the following requirements as a minimum. โ€ข The Transaction Transformer must run in parallel with the Transaction Transformer that is currently in situ as per technical specification โ€ข The transformer shall comply with the design, construction, testing and other requirements to the European standard EN โ€ฆ View the procurement ยป
2020-06-16   Turnkey Delivery of High Voltage Electrical Substations in the Republic of Ireland Pursuant to a... (Electricity Supply Board (ESB))
The contracting entity intends to procure a multi-supplier/contractor framework agreement for the turnkey delivery of high voltage substations in the Republic of Ireland. Refer to section A.1.1 of the PQQ for a general description of the proposed scope of the framework. View the procurement ยป