2024-08-23   24/027 Provision of Capital Works (Facilities) for Uisce ร‰ireann (Uisce ร‰ireann)
Uร‰ intends to establish a multi party framework agreement for the provision of Capital Works. The framework is for 5 years with the option to extend for a futher 3 years (in one year intervals) up to a maximum of 8 years. Uร‰ currently has a building estate comprising of 9 office buildings nationally, ranging in size from 250 square metres to 5,000 square metres. This portfolio is expected to grow as part of the Uisce ร‰ireann transformation programme being undertaken as part of the Water Industry โ€ฆ View the procurement ยป
2024-06-21   IDA Parkmore Pond Refurbishment Works (IDA Ireland)
Provision of Pond Refurbishment Works at IDA Parkmore Business Park, Brockagh, Galway View the procurement ยป
2023-02-22   Construction of The National Agricultural Sustainability,Research and Innovation Centre (NASRIC), Johnstown Castle, Wexford (Teagasc)
New Laboratory Building, overall area c. 2,000m2 together with associated site works. Limited extension and refurbishment of existing buildings in same general location. See attached documentation for additional information View the procurement ยป
2019-12-20   Refurbishment and Extension of a Training Centre for the use of Waterford and Wexford Education and Training Board... (Waterford and Wexford Education and Training Board)
This project will include the refurbishment and extension of an existing industrial building. The existing building consists mainly of a single storey 2-bay portal framed clad unit approximately 4 550 m and the extensions will be approximately 550 m (approx. 5 100 m total development size). The building will be refurbished to cater for a change-of-use from industrial to an educational facility. The procurement authority for this contract is WWETB and the contract will be concluded with Gortrush โ€ฆ View the procurement ยป
2019-11-11   19/207 Irish Water National Laboratory (Irish Water)
The proposed IW National Laboratory will have an expected analytical capacity of approximately 1 200 000 tests per year. The laboratory will have organic and inorganic chemistry laboratories, microbiology and parasitology laboratories with all of the required supporting services including utility support areas, gas stores, consumables storage and waste storage areas. The facility will also have meeting rooms, offices, and reception, canteen and welfare facilities for the laboratory staff. It is โ€ฆ View the procurement ยป
2019-05-08   Sport and Physical Activity Logic Model (Sport Ireland)
Sport Ireland is seeking to develop a public awareness campaign to engage with and also to encourage more men (40 +) in identified disadvantaged areas to participate in sport and physical activity. View the procurement ยป
2008-12-11   Research and testing facilities construction work (National Institute for Bioprocessing Research & Training (NIBRT))
Title attributed to the contract by the contracting authority: Bio-processing Research & Training Facility. The successful contractor will be required to complete the construction for the two storey, 6 000 m2 bioprocess simulated GMP pilot plant, laboratory, training and office facility, including receipt of free issue process equipment and novated Automation contract where required. The new NIBRT facility, to be located at Fosters Ave, Dublin 4, will be a state-of-the-art facility to conduct both โ€ฆ View the procurement ยป
2008-02-14   Technical automobile inspection services (Road Safety Authority)
Title attributed to the contract by the contracting authority: National Car Testing Services Contract. Contract to provide and operate the National Car Testing Service at locations nationwide, anticipated to commence in early 2010. View the procurement ยป