Recent procurements of cold-storage installations in Ireland
2016-10-14Curragh Racecourse Redevelopment (Contract Phase 3): Contract for the Main Works Package โ Catering Equipment... (Curragh Racecourse Ltd)
The Catering Equipment contract involves the supply and installation of all identified โheavy equipmentโ in relation to the Curragh Racecourse Redevelopment Project. As part of the contract the Catering Equipment Contractor will be responsible for all coordination drawings, based on the constructed structural spaces ensuring coordination with all equipment in the specification package. This shall include all bespoke and proprietary items (the detail design drawings shall be BIM models reflecting design โฆ
View the procurement ยป Mentioned suppliers:Kaneco Limited
2014-03-14ENQEIR409 - Provision of Local Reserve (EirGrid plc)
The risk of a local shortage of generation adequacy is caused by restrictions on the transmission network. The Northern Ireland Authority for Utility Regulation (NIAUR) has written to SONI requesting it to explore arrangements, such as putting in place relevant System Support Services, to alleviate some or all of the risk identified. NIAUR has noted that any such arrangements should be time limited and that any additional costs of putting in place such measures should be reasonable and proportionate. โฆ
View the procurement ยป
2013-08-28ENQEIR336 - Short Term Active Response (EirGrid plc)
STAR is an interruptible load type service in Ireland by which electricity consumers agree to have either their entire load or a portion of their load disconnected, without notice, during an under-frequency incident. STAR assists in the recovery of the power system frequency to normal operating conditions following the loss of a major generation in-feed to the power system. The TSO makes payment for the service based on the level of load that an electricity consumer makes available for interruption.