2019-11-18AHLC: Reserved Specialists (Grangegorman Development Agency)
The initial phase of the TU Dublin Academic Hub and Library Complex is planned as a cluster of buildings and courtyards, both existing and new around the historic North House protected structure. The library and student support complex will sit at the heart of the new Grangegorman campus, addressing a large plaza and commanding views over the city.
The overall Phase 1 development is approximately 12 580 m in area. The development consists of 9 505 m of new build construction with the balance comprising โฆ
View the procurement ยป
2019-09-06Samuel Beckett Civic Campus Phase 2: Timber Facade (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
A. the change of use of the Phase 1 sports and community building to a library and community building;
B. refurbishment of the existing sports building to create a new library;
C. the construction of a new sports building, incorporating a 25 metre swimming pool, a โฆ
View the procurement ยป
2019-09-06Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
(a) the change of use of the Phase 1 sports and community building to a library and community building;
(b) refurbishment of the existing sports building to create a new library;
(c) the construction of a new sports building, incorporating a 25 metre swimming pool, a โฆ
View the procurement ยป
2016-06-16Hanging Gardens Development, Henry St, Limerick (Limerick City and County Council)
The development will comprise the completion of a partially constructed circa 7 765m 6 storey over basement shell and core office building, the demolition of no 19 Henry St and the construction of a circa 1 900 m 5 storey shell and core office building, the refurbishment of circa 680 m of the existing Mercantile, GPO and Hanging Gardens Buildings and associated external works.
View the procurement ยป
2015-08-27Works Specialists with Design Input for the new childrenโs hospital at St James Campus, Dublin 8 (National Paediatric Hospital Development Board)
The scope of the main works for the new children's hospital in broad terms comprises of:
โ The demolition of all buildings on the site of the new children's hospital;
โ Construction of a new children's hospital building and associated helipad;
โ A two-level underground car park under same, with a further level of shared facilities management hub and energy centre below;
โ Public realm improvements to the existing St James's campus spine road; the linear park at the Rialto Luas stop and the public steps โฆ
View the procurement ยป