2020-06-17Sale of Power Plant Equipment (Electricity Supply Board (ESB))
ESB is examining the potential to offer for sale power plant equipment that is no longer in use.
The equipment for sale includes:
โข gas turbines,
โข gas turbine spares (unused),
โข fuel handling plant for solid fuels,
โข gas fired boiler,
โข solid fuel boilers,
โข condensing steam turbines,
โข generators,
โข transformers,
โข associated equipment with above,
โข other associated spare parts for above (unused).
Equipment is suitable for power plant outputs in the range 85 to 270 MW electrical.
Interested parties โฆ
View the procurement ยป
2015-03-20Thermal Energy Efficiency Project (Irish Prison Service)
The project aims are to provide for the upgrade of the West Dublin Campus, thermal distribution and hot water systems to reduce the campus thermal energy profile in keeping with the public body requirements from Government to reduce energy consumption by 33 % by 2020.
To provide an energy efficient system to achieve the thermal comfort of all persons using the building and to provide this by means of a energy performance based contract, which will provide the guarantees necessary to fund the project โฆ
View the procurement ยป