Procurements: Greenville Energy

2 archived procurements

Recent procurements by Greenville Energy

2025-09-19   REGENERATE - Biosolids Separator and Pumping Equipment (Greenville Energy)
The supply, installation, and commissioning of a solidsโ€“liquid separation system (press screw separator) and progressive cavity pumps for handling anaerobic digestate, slurry, and similar biogas substrates. Equipment must be suitable for continuous outdoor operation in ambient temperatures of 0โ€“40 degrees Celsius All equipment shall be designed for a minimum service life of 15 to 20 years, with routine preventative maintenance. The system must comply with relevant EU Machinery, Pressure Equipment, and โ€ฆ View the procurement ยป
2025-09-19   Regenerate - Digestate Centrifuge (Greenville Energy)
The centrifuge system shall be designed for the separation of biosolids from anaerobic digestate and sludge, ensuring robust, reliable, and safe operation. The system must be suitable for continuous industrial use and capable of handling variable sludge characteristics. Minimum design life: 20 years under normal operating conditions with appropriate maintenance. The system must be delivered, installed, commissioned, and supported by the supplier, including provision of training and documentation. All โ€ฆ View the procurement ยป