2025-06-20HEATING SYSTEM UPGRADE WORKS (Ballinlough NS)
The project involves the following scope of works: โขDisconnect and remove boiler, pipework, pumps, and controls from boiler house and install a new plantroom fit out. โข Disconnect and remove oil tank and drain down oil line; โข Install new Building Energy Monitoring System (BEMS) to control the heating system and monitor fuel use; โข Replace existing heating distribution pipework throughout the school. โข Replace existing radiators. โข Replace oil tank with new LPG tank on concrete plinth with security cage. โฆ
View the procurement ยป