Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
Office of Public Works (OPW)
Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
DeadlineThe time limit for receipt of tenders was 2026-05-28. The procurement was published on 2026-04-30.
SuppliersThe following suppliers are mentioned in award decisions or other procurement documents:
- โข BTY Ireland Ltd.
- โข Architectural and related services โบ Advisory architectural services
- โข Architectural, engineering and planning services โบ Project and design preparation, estimation of costs
- โข Architectural, engineering and planning services โบ Supervision of project and documentation
- โข Aฯฯฮนฮบฮฎ โบ ฮฯฯฮตฮนฮฟฯ ฮคฮฟฮผฮญฮฑฯ ฮฮธฮทฮฝฯฮฝ
- โข Eastern and Midland โบ Dublin
- โข Eastern and Midland โบ Mid-East
Procurement history
| Date | Document |
|---|---|
| 2026-04-30 | Contract notice |
| 2026-05-21 | Contract notice |
| 2026-10-15 | Contract award notice |
Contract notice (2026-04-30)
Object
Scope of the procurement
Title: Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
Short description:
Products/services: Architectural, construction, engineering and inspection services ๐ฆ
Estimated value excluding VAT: 0 EUR ๐ฐ
Description
Internal identifier:
Additional products/services:
Country: Ireland ๐ฎ๐ช
Place of performance: Dublin ๐๏ธ
Duration: 25 months
Title
Lot Identification Number:
Procedure
Type of procedure
Open procedure โ
Legal basis: Directive 2014/24/EU
Administrative information
Time limit for receipt of tenders or requests to participate: 2026-05-28 15:00:00 ๐
Conditions for opening of tenders: 2026-05-28 15:30:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8032898
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 180 days
Tendering terms
Tenderers may submit more than one tender
Opening date: 2026-05-28 15:30:00 ๐
Place: https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8032898
Electronic invoicing: Allowed
Electronic ordering will be used โ
Electronic payment will be used โ
Deadline for requesting additional information: 2026-05-11 15:00:00 ๐
Contracting authority
Name and addresses
Name: Office of Public Works (OPW)
National registration number:
Postal address: Jonathan Swift Street
Postal code: C15 NX36
Postal town: Trim
Region: Dublin ๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: marc.jago@opw.ie ๐ง
Phone: +353 46 942 2000 ๐
URL: https://www.gov.ie/en/organisation/office-of-public-works/ ๐
Address of the buyer profile: https://www.gov.ie/en/organisation/office-of-public-works/ ๐
Type of the contracting authority
Ministry or any other national or federal authority
Main activity
General public services
Communication
Documents URL: https://www.etenders.gov.ie/epps/cft/listContractDocuments.do?resourceId=8032898 ๐
Participation URL: https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=8032898 ๐
Electronic submission: Required
Complementary information
Review body
Name: The High Court of Ireland
National registration number:
Department: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin ๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie ๐ง
Phone: +353 1 8886000 ๐
Service from which information about the review procedure may be obtained
Same as: Review body
Information about electronic workflows
Electronic invoicing will be accepted
Source: OJS 2026/S 085-304125 (2026-04-30)
Object
Scope of the procurement
Title: Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
Short description:
Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
Type of contract: Services
Products/services: Architectural, construction, engineering and inspection services ๐ฆ
Estimated value excluding VAT: 0 EUR ๐ฐ
Description
Internal identifier:
0
Additional products/services:
Place of performance: Dublin ๐๏ธ
Duration: 25 months
Title
Lot Identification Number:
LOT-0001
Procedure
Type of procedure
Open procedure โ
Legal basis: Directive 2014/24/EU
Administrative information
Time limit for receipt of tenders or requests to participate: 2026-05-28 15:00:00 ๐
Conditions for opening of tenders: 2026-05-28 15:30:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8032898
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 180 days
Tendering terms
Tenderers may submit more than one tender
Opening date: 2026-05-28 15:30:00 ๐
Place: https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=8032898
Electronic invoicing: Allowed
Electronic ordering will be used โ
Electronic payment will be used โ
Deadline for requesting additional information: 2026-05-11 15:00:00 ๐
Contracting authority
Name and addresses
Name: Office of Public Works (OPW)
National registration number:
2109
Postal address: Jonathan Swift Street
Postal code: C15 NX36
Postal town: Trim
Region: Dublin ๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: marc.jago@opw.ie ๐ง
Phone: +353 46 942 2000 ๐
URL: https://www.gov.ie/en/organisation/office-of-public-works/ ๐
Address of the buyer profile: https://www.gov.ie/en/organisation/office-of-public-works/ ๐
Type of the contracting authority
Ministry or any other national or federal authority
Main activity
General public services
Communication
Documents URL: https://www.etenders.gov.ie/epps/cft/listContractDocuments.do?resourceId=8032898 ๐
Participation URL: https://www.etenders.gov.ie/epps/cft/viewTenders.do?resourceId=8032898 ๐
Electronic submission: Required
Complementary information
Review body
Name: The High Court of Ireland
National registration number:
The High Court of Ireland
Department: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin ๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie ๐ง
Phone: +353 1 8886000 ๐
Service from which information about the review procedure may be obtained
Same as: Review body
Information about electronic workflows
Electronic invoicing will be accepted
Source: OJS 2026/S 085-304125 (2026-04-30)
Contract notice (2026-05-21)
Object
Scope of the procurement
Estimated value excluding VAT: 0 EUR ๐ฐ
Procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2026-06-04 15:00:00 ๐
Conditions for opening of tenders: 2026-06-04 15:30:00 ๐
Tendering terms
Opening date: 2026-06-04 15:30:00 ๐
Contracting authority
Name and addresses
Region: Mid-East ๐๏ธ
Changes
Other additional information
Extension of Time
Main reason for change: Information updated
Information about modifications
Version of the previous notice to be changed: 21f1a873-e350-4b7c-928c-11213b7c27de-01
Source: OJS 2026/S 099-354689 (2026-05-21)
Object
Scope of the procurement
Estimated value excluding VAT: 0 EUR ๐ฐ
Procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2026-06-04 15:00:00 ๐
Conditions for opening of tenders: 2026-06-04 15:30:00 ๐
Tendering terms
Opening date: 2026-06-04 15:30:00 ๐
Contracting authority
Name and addresses
Region: Mid-East ๐๏ธ
Changes
Other additional information
Extension of Time
Main reason for change: Information updated
Information about modifications
Version of the previous notice to be changed: 21f1a873-e350-4b7c-928c-11213b7c27de-01
Source: OJS 2026/S 099-354689 (2026-05-21)
Contract award notice (2026-10-15)
Object
Scope of the procurement
Estimated value excluding VAT: 0 EUR ๐ฐ
Total value of the procurement (excluding VAT): 53 500 EUR ๐ฐ
Award criteria
Cost criterion (name): Most Economic Advantageous Tender
Award of contract
A contract/lot is awarded โ
Lot Identification Number:
Contract Number:
Date of conclusion of the contract: 2026-09-08 ๐
Information about tenders
Number of tenders received: 6
Information on value of the contract/lot (excluding VAT)
Total value of the contract/lot: 53 500 EUR ๐ฐ
Tender identifier:
Identifier of lot or group of lots:
Name and address of the contractor
Name: BTY Ireland Ltd.
National registration number:
Postal address: Suite 14 27 Mount Street Upper
Postal code: D02ER26
Postal town: DUBLIN 2
Region: Dublin ๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: justinsudbury@bty.com ๐ง
Phone: 353 1 576 7320 ๐
Size of the economic operator: Micro
Source: OJS 2026/S 201-717218 (2026-10-15)
Object
Scope of the procurement
Estimated value excluding VAT: 0 EUR ๐ฐ
Total value of the procurement (excluding VAT): 53 500 EUR ๐ฐ
Award criteria
Cost criterion (name): Most Economic Advantageous Tender
Award of contract
A contract/lot is awarded โ
Lot Identification Number:
LOT-0001
Contract Number:
460222
Date of conclusion of the contract: 2026-09-08 ๐
Information about tenders
Number of tenders received: 6
Information on value of the contract/lot (excluding VAT)
Total value of the contract/lot: 53 500 EUR ๐ฐ
Tender identifier:
000177691
Identifier of lot or group of lots:
LOT-0001
Name and address of the contractor
Name: BTY Ireland Ltd.
National registration number:
623858
Postal address: Suite 14 27 Mount Street Upper
Postal code: D02ER26
Postal town: DUBLIN 2
Region: Dublin ๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: justinsudbury@bty.com ๐ง
Phone: 353 1 576 7320 ๐
Size of the economic operator: Micro
Source: OJS 2026/S 201-717218 (2026-10-15)
New procurements in related categories ๐
- Architectural, construction, engineering and inspection services (>20 new procurements)
- Architectural and related services (19)
- Construction-related services (8)
- Consulting services for water-supply and waste consultancy (2)
- Engineering services (>20)
- Laboratory services (3)
- Monitoring and control services (2)
- Technical testing, analysis and consultancy services (7)
- Urban planning and landscape architectural services (10)