The IDA Raheen Business Park is located on the southern fringe of Limerick City approx. 5kms from the City Centre. The Park is accessible from the nearby M20 Motorway and has two main access routes which include the predominant access from the Ballycummin Road off the M20 while the R526 road provides secondary access to its northwestern entrance. In recent years with the continued growth and development of the IDA Raheen Business Park, issues with traffic and congestion have become more pronounced and it is a significant concern for many of the tenants in the park. The daily staff volumes and freight movements are significant, leading to pressures on transport infrastructure and parking facilities as continually highlighted by current tenants. The Raheen area faces challenges related to car dependency, limited public transport options, and growing traffic congestion and those effects are felt within the IDA Park. In May 2024, a Transport Strategy for the park was commenced. The aim of the Transport Strategy was to provide IDA with a robust, evidence-based framework for advancing sustainable transport solutions that support both IDA objectives and the growth ambitions of tenant companies. From consultation with tenants, the Local Authority and stakeholders, combined with the findings of the ABTA, and to allow for continued expansion of the Park a Mobility Management Plan Framework is now being established and its implementation will be coordinated on the Park over the next 5 years. In addition to the MPPF, the Transport Strategy (informed by the ABTA) provided several preferred options which included a long list of infrastructural interventions which could be broken down into 3 categories. 1. Active Travel Options 2. Public Transport Options 3. Access and Capacity Option This Call for Tenders concerns 4 separate key priority items from the Access and Capacity Options recommendations to be delivered; they include the following: 1. Part Time Signalisation of Roches Avenue Roundabout in the PM Peak 2. Bypass Lane on Southern Arm of Roches Avenue Roundabout 3. Provision of Pedestrian Crossing and Lighting at Roches Avenue Roundabout 4. Provision of 2 x Pedestrian Crossing and Junction Upgrade at National Learning Centre. IDA Strategic Property Department is now seeking to appoint a Project Management Led Integrated Multi-Disciplinary Team to deliver all of the above and services outlined in this document. The Project Management led Multi-Disciplinary Team will manage and provide all relevant consultancy services with respect to the design and delivery of the project at IDA Raheen Business Park, Co. Limerick. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil Engineer, QS, Transport Engineer, M and E Engineer, Health and Safety Consultant, Assigned Certifier, PSDP and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include (1) Preliminary Stage (2) Detailed Design and Planning Stage (3) Tender, Evaluation and Award (4) Construction and (5) Handover.
Deadline
The time limit for receipt of tenders was 2026-02-05.
The procurement was published on 2026-01-06.
Contract notice (2026-01-06) Object Scope of the procurement
Title: Project Management Led Multi-Disciplinary Team for Construction Consultancy Services
Short description:
โThe IDA Raheen Business Park is located on the southern fringe of Limerick City approx. 5kms from the City Centre. The Park is accessible from the nearby...โ
Short description
The IDA Raheen Business Park is located on the southern fringe of Limerick City approx. 5kms from the City Centre. The Park is accessible from the nearby M20 Motorway and has two main access routes which include the predominant access from the Ballycummin Road off the M20 while the R526 road provides secondary access to its northwestern entrance. In recent years with the continued growth and development of the IDA Raheen Business Park, issues with traffic and congestion have become more pronounced and it is a significant concern for many of the tenants in the park. The daily staff volumes and freight movements are significant, leading to pressures on transport infrastructure and parking facilities as continually highlighted by current tenants. The Raheen area faces challenges related to car dependency, limited public transport options, and growing traffic congestion and those effects are felt within the IDA Park. In May 2024, a Transport Strategy for the park was commenced. The aim of the Transport Strategy was to provide IDA with a robust, evidence-based framework for advancing sustainable transport solutions that support both IDA objectives and the growth ambitions of tenant companies. From consultation with tenants, the Local Authority and stakeholders, combined with the findings of the ABTA, and to allow for continued expansion of the Park a Mobility Management Plan Framework is now being established and its implementation will be coordinated on the Park over the next 5 years. In addition to the MPPF, the Transport Strategy (informed by the ABTA) provided several preferred options which included a long list of infrastructural interventions which could be broken down into 3 categories. 1. Active Travel Options 2. Public Transport Options 3. Access and Capacity Option This Call for Tenders concerns 4 separate key priority items from the Access and Capacity Options recommendations to be delivered; they include the following: 1. Part Time Signalisation of Roches Avenue Roundabout in the PM Peak 2. Bypass Lane on Southern Arm of Roches Avenue Roundabout 3. Provision of Pedestrian Crossing and Lighting at Roches Avenue Roundabout 4. Provision of 2 x Pedestrian Crossing and Junction Upgrade at National Learning Centre. IDA Strategic Property Department is now seeking to appoint a Project Management Led Integrated Multi-Disciplinary Team to deliver all of the above and services outlined in this document. The Project Management led Multi-Disciplinary Team will manage and provide all relevant consultancy services with respect to the design and delivery of the project at IDA Raheen Business Park, Co. Limerick. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil Engineer, QS, Transport Engineer, M and E Engineer, Health and Safety Consultant, Assigned Certifier, PSDP and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include (1) Preliminary Stage (2) Detailed Design and Planning Stage (3) Tender, Evaluation and Award (4) Construction and (5) Handover.
Show more
Type of contract: Services
Products/services: Construction project management services๐ฆ
Estimated value excluding VAT: 150 000 EUR ๐ฐ
Description
Description of the procurement:
โThe IDA Raheen Business Park is located on the southern fringe of Limerick City approx. 5kms from the City Centre. The Park is accessible from the nearby...โ
Description of the procurement
The IDA Raheen Business Park is located on the southern fringe of Limerick City approx. 5kms from the City Centre. The Park is accessible from the nearby M20 Motorway and has two main access routes which include the predominant access from the Ballycummin Road off the M20 while the R526 road provides secondary access to its northwestern entrance. In recent years with the continued growth and development of the IDA Raheen Business Park, issues with traffic and congestion have become more pronounced and it is a significant concern for many of the tenants in the park. The daily staff volumes and freight movements are significant, leading to pressures on transport infrastructure and parking facilities as continually highlighted by current tenants. The Raheen area faces challenges related to car dependency, limited public transport options, and growing traffic congestion and those effects are felt within the IDA Park. In May 2024, a Transport Strategy for the park was commenced. The aim of the Transport Strategy was to provide IDA with a robust, evidence-based framework for advancing sustainable transport solutions that support both IDA objectives and the growth ambitions of tenant companies. From consultation with tenants, the Local Authority and stakeholders, combined with the findings of the ABTA, and to allow for continued expansion of the Park a Mobility Management Plan Framework is now being established and its implementation will be coordinated on the Park over the next 5 years. In addition to the MPPF, the Transport Strategy (informed by the ABTA) provided several preferred options which included a long list of infrastructural interventions which could be broken down into 3 categories. 1. Active Travel Options 2. Public Transport Options 3. Access and Capacity Option This Call for Tenders concerns 4 separate key priority items from the Access and Capacity Options recommendations to be delivered; they include the following: 1. Part Time Signalisation of Roches Avenue Roundabout in the PM Peak 2. Bypass Lane on Southern Arm of Roches Avenue Roundabout 3. Provision of Pedestrian Crossing and Lighting at Roches Avenue Roundabout 4. Provision of 2 x Pedestrian Crossing and Junction Upgrade at National Learning Centre. IDA Strategic Property Department is now seeking to appoint a Project Management Led Integrated Multi-Disciplinary Team to deliver all of the above and services outlined in this document. The Project Management led Multi-Disciplinary Team will manage and provide all relevant consultancy services with respect to the design and delivery of the project at IDA Raheen Business Park, Co. Limerick. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil Engineer, QS, Transport Engineer, M and E Engineer, Health and Safety Consultant, Assigned Certifier, PSDP and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include (1) Preliminary Stage (2) Detailed Design and Planning Stage (3) Tender, Evaluation and Award (4) Construction and (5) Handover.
Procedure Type of procedure
Open procedure โ Administrative information
Time limit for receipt of tenders or requests to participate: 2026-02-05 00:00:00 ๐
Conditions for opening of tenders: 2026-02-06 00:00:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=7270297
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 180
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Service from which information about the review procedure may be obtained
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Information about electronic workflows
Electronic invoicing will be accepted
Electronic ordering will be used
Electronic payment will be used
Source: OJS 2026/S 004-007084 (2026-01-06)
Contract award notice (2026-04-16) Object Scope of the procurement
Estimated value excluding VAT: 150 000 EUR ๐ฐ
Total value of the procurement (excluding VAT): 86 750 EUR ๐ฐ
Description
Place of performance: Mid-West ๐๏ธ Award criteria
Quality criterion (name): 70:30
Quality criterion (weighting): 100
Award of contract
A contract/lot is awarded โ
Lot Identification Number: LOT-0001
Contract Number: 439438
Date of conclusion of the contract: 2026-03-25 ๐
Information about tenders
Number of tenders received by electronic means: 2
Information on value of the contract/lot (excluding VAT)
Total value of the contract/lot: 86 750 EUR ๐ฐ
Name and address of the contractor
Name: O'Connor Sutton Cronin_19870
National registration number: 138329
Postal address: 9 Prussia Street, Dublin 7,
Postal code: D07 KT57
Postal town: Dublin
Region: Mid-West ๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: niall.rooney@ocsc.ie๐ง
Phone: 0873442450๐
URL: www.ocsc.ie๐
Contracting authority Name and addresses
National registration number: Not applicable
Region: Dublin๐๏ธ Type of the contracting authority
Ministry or any other national or federal authority
Source: OJS 2026/S 076-267388 (2026-04-16)