SMARTPLY Europe DAC are seeking tender submissions from suitably qualified construction companies to construct a new welding room at their facility at Belview, Slieverue, Waterford, X91 PX75 as per the attached specification. SmartPly will act as PSCS. The proposed works are detailed on the Tender Drawings. The works include: โข Removal Works โข Concrete Works โข New Roller Door Supply + Installation โข Waste Removal Requirements 1. Removal works a. Removal of steel collars from ops in walls (work at high levels) i. Wall 1 Ops sizes = 400ร x2 100ร x1 ii. Wall 2 Ops sizes = 200ร x2 100ร x1 iii. Wall 3 Ops sizes = 400ร x6 200ร x3 300ร x1 100ร x1 b. Open roller door between rooms and leave in place. c. Removal of Ramp between rooms from roller door location. d. Remove Ramp under roller door into plant e. Remove Single personnel door between rooms. (W1000 x H2100) f. Remove single personnel door to allow removal of step to lower door position to level with floor. (access/egress onto plant floor) door to be re-installed. g. Cut 3m channel 50mm x 50mm in floor to install steel cable conduit for electrical supply to band saw. h. Make opening in outside wall for new single fire exit door (W1000 x H2100) i. Remove plinth outside of building wall (new fire exit door location) 2. Concrete works a. Close up ops with block work to match existing walls (work at high levels) i. Wall 1 Ops sizes = 400ร x2 100ร x1 ii. Wall 2 Ops sizes = 200ร x2 100ร x1 iii. Wall 3 Ops sizes = 400ร x6 200ร x3 300ร x1 100ร x1 b. Close up roller door opening with block work to match existing wall c. Close up single door opening with block work to match existing wall. d. Replace single personnel door at lower floor level โ opening at top of door required to be closed (access/egress onto plant floor) e. Pour section of cable channel level to existing floor level. f. Pour new floor section at roller doors to existing floor levels. g. Pour new section of concrete yard to match existing yard level outside building. h. Concrete should be Grade C30/37 and steel mesh included. 3. New Roller door supply + Installation a. New roller door to include framework and flashings to be supplied and installed in outside building wall opening by the contractor โ W3800 x H 4000 b. Section of building sheeting above and to side of new roller door to be supplied and installed. c. New door canopy over fire exit to be supplied and installed. d. Fire exit door โ supplied by SmartPly โ installation by contractor 4. Waste Removal requirements a. All metal waste to go to the Smartply metal scrap skip b. All electrical waste to go to the electrical waste skip c. Contractor is responsible for the removal of all concrete waste from the SmartPly site to a registered waste site and disposal cert must be returned to SmartPly for EPA waste disposal file 5. Quote Requirements a. Contractor required to check site and requirements for installation works. b. Quote to provide breakdown of each individual task + cost i. Removal works ii. Concrete works iii. New Roller door supply and installation iv. Waste removal v. Safety + Method statement vi. Total cost 6. Work schedule a. estimated start time โ TBC b. estimated duration of works c. Schedule plan of works 7. Site requirements Please be aware Smartply will require method statements (must be submitted in the Smartply Europe format) โ Training records of worker/ Manual Handling certs, Safe pass, MEWPโs etc. Plant Equipment Certs to be uploaded on the Dulann safety system and online induction completed before any work can commence on the Smartply site.
Deadline
The time limit for receipt of tenders was 2025-12-15.
The procurement was published on 2025-11-24.
Contract notice (2025-11-24) Object Scope of the procurement
Title: RFT for New Welding Room Civils Work at SmartPly Europe DAC'25
Short description:
โSMARTPLY Europe DAC are seeking tender submissions from suitably qualified construction companies to construct a new welding room at their facility at...โ
Short description
SMARTPLY Europe DAC are seeking tender submissions from suitably qualified construction companies to construct a new welding room at their facility at Belview, Slieverue, Waterford, X91 PX75 as per the attached specification. SmartPly will act as PSCS. The proposed works are detailed on the Tender Drawings. The works include: โข Removal Works โข Concrete Works โข New Roller Door Supply + Installation โข Waste Removal Requirements 1. Removal works a. Removal of steel collars from ops in walls (work at high levels) i. Wall 1 Ops sizes = 400ร x2 100ร x1 ii. Wall 2 Ops sizes = 200ร x2 100ร x1 iii. Wall 3 Ops sizes = 400ร x6 200ร x3 300ร x1 100ร x1 b. Open roller door between rooms and leave in place. c. Removal of Ramp between rooms from roller door location. d. Remove Ramp under roller door into plant e. Remove Single personnel door between rooms. (W1000 x H2100) f. Remove single personnel door to allow removal of step to lower door position to level with floor. (access/egress onto plant floor) door to be re-installed. g. Cut 3m channel 50mm x 50mm in floor to install steel cable conduit for electrical supply to band saw. h. Make opening in outside wall for new single fire exit door (W1000 x H2100) i. Remove plinth outside of building wall (new fire exit door location) 2. Concrete works a. Close up ops with block work to match existing walls (work at high levels) i. Wall 1 Ops sizes = 400ร x2 100ร x1 ii. Wall 2 Ops sizes = 200ร x2 100ร x1 iii. Wall 3 Ops sizes = 400ร x6 200ร x3 300ร x1 100ร x1 b. Close up roller door opening with block work to match existing wall c. Close up single door opening with block work to match existing wall. d. Replace single personnel door at lower floor level โ opening at top of door required to be closed (access/egress onto plant floor) e. Pour section of cable channel level to existing floor level. f. Pour new floor section at roller doors to existing floor levels. g. Pour new section of concrete yard to match existing yard level outside building. h. Concrete should be Grade C30/37 and steel mesh included. 3. New Roller door supply + Installation a. New roller door to include framework and flashings to be supplied and installed in outside building wall opening by the contractor โ W3800 x H 4000 b. Section of building sheeting above and to side of new roller door to be supplied and installed. c. New door canopy over fire exit to be supplied and installed. d. Fire exit door โ supplied by SmartPly โ installation by contractor 4. Waste Removal requirements a. All metal waste to go to the Smartply metal scrap skip b. All electrical waste to go to the electrical waste skip c. Contractor is responsible for the removal of all concrete waste from the SmartPly site to a registered waste site and disposal cert must be returned to SmartPly for EPA waste disposal file 5. Quote Requirements a. Contractor required to check site and requirements for installation works. b. Quote to provide breakdown of each individual task + cost i. Removal works ii. Concrete works iii. New Roller door supply and installation iv. Waste removal v. Safety + Method statement vi. Total cost 6. Work schedule a. estimated start time โ TBC b. estimated duration of works c. Schedule plan of works 7. Site requirements Please be aware Smartply will require method statements (must be submitted in the Smartply Europe format) โ Training records of worker/ Manual Handling certs, Safe pass, MEWPโs etc. Plant Equipment Certs to be uploaded on the Dulann safety system and online induction completed before any work can commence on the Smartply site.
Show more
Type of contract: Works
Products/services: Construction work for industrial buildings๐ฆ
Estimated value excluding VAT: 50 000 EUR ๐ฐ
Description
Description of the procurement:
โSMARTPLY Europe DAC are seeking tender submissions from suitably qualified construction companies to construct a new welding room at their facility at...โ
Description of the procurement
SMARTPLY Europe DAC are seeking tender submissions from suitably qualified construction companies to construct a new welding room at their facility at Belview, Slieverue, Waterford, X91 PX75 as per the attached specification. SmartPly will act as PSCS. The proposed works are detailed on the Tender Drawings. The works include: โข Removal Works โข Concrete Works โข New Roller Door Supply + Installation โข Waste Removal Requirements 1. Removal works a. Removal of steel collars from ops in walls (work at high levels) i. Wall 1 Ops sizes = 400ร x2 100ร x1 ii. Wall 2 Ops sizes = 200ร x2 100ร x1 iii. Wall 3 Ops sizes = 400ร x6 200ร x3 300ร x1 100ร x1 b. Open roller door between rooms and leave in place. c. Removal of Ramp between rooms from roller door location. d. Remove Ramp under roller door into plant e. Remove Single personnel door between rooms. (W1000 x H2100) f. Remove single personnel door to allow removal of step to lower door position to level with floor. (access/egress onto plant floor) door to be re-installed. g. Cut 3m channel 50mm x 50mm in floor to install steel cable conduit for electrical supply to band saw. h. Make opening in outside wall for new single fire exit door (W1000 x H2100) i. Remove plinth outside of building wall (new fire exit door location) 2. Concrete works a. Close up ops with block work to match existing walls (work at high levels) i. Wall 1 Ops sizes = 400ร x2 100ร x1 ii. Wall 2 Ops sizes = 200ร x2 100ร x1 iii. Wall 3 Ops sizes = 400ร x6 200ร x3 300ร x1 100ร x1 b. Close up roller door opening with block work to match existing wall c. Close up single door opening with block work to match existing wall. d. Replace single personnel door at lower floor level โ opening at top of door required to be closed (access/egress onto plant floor) e. Pour section of cable channel level to existing floor level. f. Pour new floor section at roller doors to existing floor levels. g. Pour new section of concrete yard to match existing yard level outside building. h. Concrete should be Grade C30/37 and steel mesh included. 3. New Roller door supply + Installation a. New roller door to include framework and flashings to be supplied and installed in outside building wall opening by the contractor โ W3800 x H 4000 b. Section of building sheeting above and to side of new roller door to be supplied and installed. c. New door canopy over fire exit to be supplied and installed. d. Fire exit door โ supplied by SmartPly โ installation by contractor 4. Waste Removal requirements a. All metal waste to go to the Smartply metal scrap skip b. All electrical waste to go to the electrical waste skip c. Contractor is responsible for the removal of all concrete waste from the SmartPly site to a registered waste site and disposal cert must be returned to SmartPly for EPA waste disposal file 5. Quote Requirements a. Contractor required to check site and requirements for installation works. b. Quote to provide breakdown of each individual task + cost i. Removal works ii. Concrete works iii. New Roller door supply and installation iv. Waste removal v. Safety + Method statement vi. Total cost 6. Work schedule a. estimated start time โ TBC b. estimated duration of works c. Schedule plan of works 7. Site requirements Please be aware Smartply will require method statements (must be submitted in the Smartply Europe format) โ Training records of worker/ Manual Handling certs, Safe pass, MEWPโs etc. Plant Equipment Certs to be uploaded on the Dulann safety system and online induction completed before any work can commence on the Smartply site.
Show more
Additional products/services: Engineering works and construction works๐ฆ
Place of performance: South-East ๐๏ธ
Duration: 1 (MONTH)
The time frame below is expressed in number of months.
Title
Lot Identification Number: LOT-0001
Procedure Type of procedure
Open procedure โ Administrative information
Time limit for receipt of tenders or requests to participate: 2025-12-15 15:00:00 ๐
Conditions for opening of tenders: 2025-12-15 15:30:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=7058972
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 4
Complementary information Review body
Name: SmartPly Europe DAC
National registration number: Smartply Europe DAC
Postal address: Bellview
Postal code: X91 PX75
Postal town: Slieveure
Region: South-East ๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: john.browne@mdfosb.com๐ง
Phone: 051 831427๐ Service from which information about the review procedure may be obtained
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Information about electronic workflows
Electronic invoicing will be accepted
Electronic ordering will be used
Electronic payment will be used
Source: OJS 2025/S 228-785690 (2025-11-24)