Remote Terminal Units (RTUs) for EirGrids Supervisory Control and Data Acquisition (SCADA)

EirGrid plc

EirGrid's Energy Management System (EMS) is connected to approximately 300 Remote Terminal Units (RTUs) and 70 Substation Control Systems (SCS). The RTUs are installed at Transmission and Generation Stations, including windfarm sites and provide Supervisory Control and Data Acquisition (SCADA) to the EMS.
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the supply of Transmission Utility SCADA equipment (hereafter referred to as RTUs which may incorporate additional communications or other functionality compared to standard RTUs) for delivery to the Republic of Ireland in accordance with the Scope of Requirements.
EirGrid intends to establish a single supplier framework.

Deadline

The time limit for receipt of tenders was 2021-12-10. The procurement was published on 2021-11-04.

Suppliers

The following suppliers are mentioned in award decisions or other procurement documents:

Who? What? Where?
Procurement history
Date Document
2021-11-04 Contract notice
2022-11-03 Contract award notice
Contract notice (2021-11-04)
Object
Scope of the procurement
Title: Scada or equivalent system
Reference number: ENQEIR783
Short description:
EirGrid's Energy Management System (EMS) is connected to approximately 300 Remote Terminal Units (RTUs) and 70 Substation Control Systems (SCS). The RTUs are installed at Transmission and Generation Stations, including windfarm sites and provide Supervisory Control and Data Acquisition (SCADA) to the EMS. The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the supply of Transmission Utility SCADA equipment (hereafter referred to as RTUs which may incorporate additional communications or other functionality compared to standard RTUs) for delivery to the Republic of Ireland in accordance with the Scope of Requirements. EirGrid intends to establish a single supplier framework.
Show more
Notice metadata
Original language: English ๐Ÿ—ฃ๏ธ
Document type: Contract notice
Nature of contract: Supplies
Regulation: European Union, with participation of GPA countries
Common procurement vocabulary (CPV)
Code: Scada or equivalent system ๐Ÿ“ฆ
Additional CPV: Electrical apparatus for switching or protecting electrical circuits ๐Ÿ“ฆ
Place of performance
NUTS region: ร‰ire/Ireland ๐Ÿ™๏ธ

Procedure
Procedure type: Negotiated procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender

Contracting authority
Identity
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Awarding authority type: Utilities entity
Awarding authority name: EirGrid plc
Postal address: Block 2 - The Oval, 160 Shelbourne Road
Postal code: Dublin 4
Postal town: Ballsbridge
Contact
Internet address: http://www.eirgrid.com ๐ŸŒ
E-mail: paul.valentine@eirgrid.com ๐Ÿ“ง
Phone: +353 12370200 ๐Ÿ“ž
URL for documents: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=200497&B=ETENDERS_SIMPLE ๐ŸŒ
URL for participation: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=200497&B=ETENDERS_SIMPLE ๐ŸŒ

Reference
Dates
Date dispatched: 2021-11-04 ๐Ÿ“…
Submission deadline: 2021-12-10 ๐Ÿ“…
Publication date: 2021-11-09 ๐Ÿ“…
Identifiers
Notice number: 2021/S 217-572494
OJ-S issue: 217
Additional information
1) Interested parties must register their interest on the eTenders web site (www.etenders.gov.ie) in order to be included on the mailing list for clarifications. All information relating to attachments, including clarifications and changes, will be published on the Irish Government Procurement Opportunities Portal (www.etenders.gov.ie) only. Registration is free of charge. The contracting authority will not accept responsibility for information relayed (or not relayed) via third parties. 2) This is the sole call for competition for this service. 3) The contracting authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers. 4) Contract award will be subject to the approval of the competent authorities. 5) It will be a condition of award that candidates are tax compliant and are in a position to produce a valid tax clearance certificate or eTax Clearance from the Revenue Commissioners when requested. 6) If for any reason it is not possible to award the contract one or more of the tenderers invited following the conclusion of this competitive process, the contracting authority reserves the right to award the contract to the next ranked tenderer as appropriate. 7) At its absolute discretion, the contracting authority may elect to terminate this procurement process or any contract awarded. 8) Please note in relation to all documents, that where reference is made to a particular standard, make, source, process, trademark, type or patent, that this is not to be regarded as a de facto requirement. In all such cases it should be understood that such indications are to be treated strictly and solely for reference purposes only, to which the words โ€˜or equivalentโ€™ will always be appended. 9) Without prejudice to the principle of equal treatment, the contracting authority is not obliged to engage in a clarification process in respect of questionnaires with missing or incomplete information. Therefore, candidates are advised to ensure that they return fully completed questionnaires in order to avoid the risk of elimination from the competition.
Show more

Object
Scope of the procurement
Short description:
EirGrid's Energy Management System (EMS) is connected to approximately 300 Remote Terminal Units (RTUs) and 70 Substation Control Systems (SCS). The RTUs are installed at Transmission and Generation Stations, including windfarm sites and provide Supervisory Control and Data Acquisition (SCADA) to the EMS.
Show more
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the supply of Transmission Utility SCADA equipment (hereafter referred to as RTUs which may incorporate additional communications or other functionality compared to standard RTUs) for delivery to the Republic of Ireland in accordance with the Scope of Requirements.
Show more
EirGrid intends to establish a single supplier framework.
Estimated total value: 1 400 000 EUR ๐Ÿ’ฐ
Short description:
The Framework Agreement period will be for an initial duration of five years with the option to extend annually for up to an additional three years, subject always to the satisfactory performance of the supplier.
Estimated value excluding VAT: 1 400 000 EUR ๐Ÿ’ฐ
Duration: 60 months
Description of options:
The initial contract period envisaged is 5 years with the possibility to extend annually up to a further 3 years, subject always to the satisfactory performance of the supplier.
The estimated spend of 1,400,000EUR is taking into account the full duration of the contract including the possible extensions. Ongoing technical support, maintenance and spare parts will be required over the lifetime of the equipments operation pursuant to Article 50.F as set out in Council Directive 2014/25/EU as transposed into Irish law by the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (S.I. 286 of 2016) (the โ€œRegulationsโ€).
Show more

Legal, economic, financial and technical information
Conditions for participation
Suitability to pursue the professional activity:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice.
List and brief description of rules and criteria:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice.
Contract execution
Deposits and guarantees required:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice.
Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice.
Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice.
Contract performance conditions:
Please see Information Memorandum and Pre-Qualification Questionnaire attached to this notice.

Procedure
Legal basis: 32014L0025
Envisaged number of candidates: 5
Objective criteria for choosing the limited number of candidates:
EirGrid envisages qualifying up to five Candidates from this pre-qualification process, subject to the quality of responses received.
If there is more than one Candidate ranked at 5th place, all the 5th placed Candidates will be invited to submit a tender proposal.
Only one company will be awarded a place on the framework.
Time of receipt of tenders: 12:00
Languages in which tenders or requests to participate may be submitted: English ๐Ÿ—ฃ๏ธ
Tender validity period: 12 months

Contracting authority
Identity
National registration number: N/a
Contact
Contact point: Paul Valentine
Address of the buyer profile: https://irl.eu-supply.com/ctm/Company/CompanyInformation/Index/219 ๐ŸŒ
Documents URL: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=200497&B=ETENDERS_SIMPLE ๐ŸŒ

Reference
Additional information
1) Interested parties must register their interest on the eTenders web site (www.etenders.gov.ie) in order to be included on the mailing list for clarifications. All information relating to attachments, including clarifications and changes, will be published on the Irish Government Procurement Opportunities Portal (www.etenders.gov.ie) only. Registration is free of charge. The contracting authority will not accept responsibility for information relayed (or not relayed) via third parties.
Show more
2) This is the sole call for competition for this service.
3) The contracting authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers.
4) Contract award will be subject to the approval of the competent authorities.
5) It will be a condition of award that candidates are tax compliant and are in a position to produce a valid tax clearance certificate or eTax Clearance from the Revenue Commissioners when requested.
6) If for any reason it is not possible to award the contract one or more of the tenderers invited following the conclusion of this competitive process, the contracting authority reserves the right to award the contract to the next ranked tenderer as appropriate.
Show more
7) At its absolute discretion, the contracting authority may elect to terminate this procurement process or any contract awarded.
8) Please note in relation to all documents, that where reference is made to a particular standard, make, source, process, trademark, type or patent, that this is not to be regarded as a de facto requirement. In all such cases it should be understood that such indications are to be treated strictly and solely for reference purposes only, to which the words โ€˜or equivalentโ€™ will always be appended.
Show more
9) Without prejudice to the principle of equal treatment, the contracting authority is not obliged to engage in a clarification process in respect of questionnaires with missing or incomplete information. Therefore, candidates are advised to ensure that they return fully completed questionnaires in order to avoid the risk of elimination from the competition.
Show more

Complementary information
Review body
Name: The High Court
Postal address: Four Courts
Postal town: Dublin
Postal code: 7
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Phone: +353 18886000 ๐Ÿ“ž
Internet address: http://www.courts.ie ๐ŸŒ
Information about review deadlines:
The contracting authority will not conclude this contract to which a standstill period applies in accordance with Council Directive 2014/25/EU, until after the expiry of the standstill period which commences on the day following the date of notification on concerned candidates and tenderers. The duration of the standstill period will be 14 calendar days where notifications are sent electronically or by fax and 16 calendar days where these are sent by any other means. The Statutory Instrument mentioned above provides that review procedures are available in the High Court to a person who has or has had an interest in obtaining the reviewable public contract and alleges that he or she has been harmed or is at risk of being harmed by an infringement of the law in relation in this contract.
Show more
Service from which information about the review procedure may be obtained
Name: Central office of the High Courts (Appeal Section)
Postal address: Ground Floor, East Wing, Inns Quay
Source: OJS 2021/S 217-572494 (2021-11-04)
Contract award notice (2022-11-03)
Object
Scope of the procurement
Short description:
This framework has been awarded. EirGrid's Energy Management System (EMS) is connected to approximately 300 Remote Terminal Units (RTUs) and 70 Substation Control Systems (SCS). The RTUs are installed at Transmission and Generation Stations, including windfarm sites and provide Supervisory Control and Data Acquisition (SCADA) to the EMS. The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who would be invited to tender for the supply of Transmission Utility SCADA equipment (hereafter referred to as RTUs which may incorporate additional communications or other functionality compared to standard RTUs) for delivery to the Republic of Ireland in accordance with the Scope of Requirements. EirGrid intends to establish a single supplier framework.
Show more
Total value of the procurement: 2 000 000 EUR ๐Ÿ’ฐ
Notice metadata
Document type: Contract award notice

Procedure
Type of bid: Not applicable

Reference
Dates
Date dispatched: 2022-11-03 ๐Ÿ“…
Publication date: 2022-11-08 ๐Ÿ“…
Identifiers
Notice number: 2022/S 215-618776
Refers to notice: 2021/S 217-572494
OJ-S issue: 215

Object
Scope of the procurement
Short description: This framework has been awarded.
Description of options:
The estimated spend of 2,000,000EUR is taking into account the full duration of the contract including the possible extensions. Ongoing technical support, maintenance and spare parts will be required over the lifetime of the equipments operation pursuant to Article 50.F as set out in Council Directive 2014/25/EU as transposed into Irish law by the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (S.I. 286 of 2016) (the โ€œRegulationsโ€).
Show more

Procedure
Award criteria
Quality criterion (name): Technical Requirements
Quality criterion (weighting): 42
Quality criterion (name): Lead Time
Quality criterion (weighting): 14
Quality criterion (name): Outline Works Programme
Quality criterion (weighting): 7
Quality criterion (name): Training
Price (weighting): 30

Award of contract
Date of contract conclusion: 2022-11-02 ๐Ÿ“…
Name: MIKRONIKA Sp. z o.o.
National registration number: PL7770001341
Postal address: Wykopy 2/4
Postal town: Poznaล„
Postal code: Wielkopolska
Country: Poland ๐Ÿ‡ต๐Ÿ‡ฑ
Phone: +48 616655600 ๐Ÿ“ž
E-mail: aleksandra.zawadzka@mikronika.com.pl ๐Ÿ“ง
Internet address: http://www.mikronika.pl ๐ŸŒ
Information about tenders
Number of tenders received: 4

Complementary information
Review body
Information about review deadlines:
The contracting authority did not conclude this contract to which a standstill period applies in accordance with Council Directive 2014/25/EU, until after the expiry of the standstill period which commences on the day following the date of notification on concerned candidates and tenderers. The duration of the standstill period was 14 calendar days where notifications were sent electronically. The Statutory Instrument mentioned above provides that review procedures are available in the High Court to a person who has or has had an interest in obtaining the reviewable public contract and alleges that he or she has been harmed or is at risk of being harmed by an infringement of the law in relation in this contract.
Show more
Source: OJS 2022/S 215-618776 (2022-11-03)