Boilers, Heat Pumps and Parts โ€” Tender

SSE Airtricity Ltd

SSE Airtricity are looking for expressions of interest from potential suppliers who can provide the following to the Republic of Ireland and Northern Ireland markets:
1) Supply of Boilers and Boiler Install Packs,
2) Supply of Boiler Spares and Parts,
3) Supply, Design and Commissioning of Heat Pump Systems.

Deadline

The time limit for receipt of tenders was 2020-05-08. The procurement was published on 2020-03-27.

Who? What? Where?
Procurement history
Date Document
2020-03-27 Contract notice
Contract notice (2020-03-27)
Object
Scope of the procurement
Title: Boilers
Short description:
SSE Airtricity are looking for expressions of interest from potential suppliers who can provide the following to the Republic of Ireland and Northern Ireland markets: 1) Supply of Boilers and Boiler Install Packs, 2) Supply of Boiler Spares and Parts, 3) Supply, Design and Commissioning of Heat Pump Systems.
Show more
Notice metadata
Original language: English ๐Ÿ—ฃ๏ธ
Document type: Contract notice
Nature of contract: Supplies
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Boilers ๐Ÿ“ฆ
Additional CPV: Boilers ๐Ÿ“ฆ
Heat pumps ๐Ÿ“ฆ
Place of performance
NUTS region: ร‰ire/Ireland ๐Ÿ™๏ธ

Procedure
Procedure type: Negotiated procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender

Contracting authority
Identity
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Awarding authority type: Utilities entity
Awarding authority name: SSE Airtricity Ltd
Postal town: Dublin
Contact
Internet address: https://www.sseairtricity.com ๐ŸŒ
E-mail: james.knight@sse.com ๐Ÿ“ง
URL for documents: http://sse.com/potential-suppliers ๐ŸŒ

Reference
Dates
Date dispatched: 2020-03-27 ๐Ÿ“…
Submission deadline: 2020-05-08 ๐Ÿ“…
Publication date: 2020-03-31 ๐Ÿ“…
Identifiers
Notice number: 2020/S 064-154045
OJ-S issue: 64
Additional information
SSE Airtricity Energy Services is an organisation that operates both in ROI and NI. We provide contracting services related to energy efficiency works in residential homes. These works include gas and oil heating upgrades, internal and external insulation, heat pumps, electrical services and full home retrofits. On average we complete in excess of 70 000 jobs per annum across the two jurisdictions. We are seeking to award three new lots of supply contracts that will include supply, specification, delivery and stock management facilitation. Each contract will have a 2-year term with an option to extend up to a maximum of 3 additional years (of 1 + 1 + 1). These three lots will include the following: 1) supply of boilers and boiler install packs, 2) supply of boiler spares and parts, 3) supply, design and commissioning of heat pump systems. Each lot may be awarded separately but will not preclude the same supplier for tendering for each lot. In addition, while this tender is focused on the ROI market for now, we will be looking to hear about your ability to provide supply services to both ROI and NI. Your availability to service the NI market or not will not preclude you from the award of the ROI contracts currently under tender. Lot 1: Boilers and boiler install packs SSE Airtricity Energy Services is seeking to award a contract for the provision of a range of domestic gas boilers and the associated install pack requirements suitable for the Irish market. Whilst price will always be a factor in our decision and must be competitive, some of the ancillary requirements are as important for the operational effectiveness of our business. We are a national energy services business covering all parts of Ireland. We have a requirement that any orders made within 24 hours can be delivered to site for the next morning by 8.30 a.m. at the latest. Lot 2: Boiler spares and parts We have a significant boiler service and repair element to our business, completing almost 20 000 service and repair jobs per annum. As such we have a requirement to be able to source and provide the main industry spares for the most popular domestic gas boilers in the market. We have a requirement that any orders made within 48 hours can be delivered or collected from a branch where possible. Lot 3: Supply, design and commissioning of heat pump systems We have a significant residential/commercial retrofit contract nationwide as an element to our business. As such we have a requirement to be able to source and provide a top tier design and supply heat-pump manufacturer for bot h Air-Air and Air-Water in the market. We are a national energy services business covering all parts of Ireland with gas. We have a requirement that any orders made within 48 hours can be delivered or collected from a branch where possible.
Show more

Object
Scope of the procurement
Short description:
SSE Airtricity are looking for expressions of interest from potential suppliers who can provide the following to the Republic of Ireland and Northern Ireland markets:
1) Supply of Boilers and Boiler Install Packs,
2) Supply of Boiler Spares and Parts,
3) Supply, Design and Commissioning of Heat Pump Systems.
Information about lots:
SSE Airtricity reverse the right to award one or multiple lots to one or more suppliers.
Title of the lot: Boilers and Boiler Install Packs
Lot number: 1
Short description:
SSE Airtricty are looking for expressions of interest from potential suppliers. Following this there will be pre-qualification questions (PQQ) followed by a tender stage.
Duration: 60 months
Title of the lot: Boiler Spares and Parts
Lot number: 2
Title of the lot: Supply, Design and Commissioning of Heat Pump Systems
Lot number: 3

Legal, economic, financial and technical information
Conditions for participation
Suitability to pursue the professional activity: Following expressions of interest a detailed PQQ will be issued.

Procedure
Legal basis: 32014L0025
Time of receipt of tenders: 14:00
Languages in which tenders or requests to participate may be submitted: English ๐Ÿ—ฃ๏ธ

Contracting authority
Contact
Contact point: James Knight
Documents URL: http://sse.com/potential-suppliers ๐ŸŒ

Reference
Additional information
SSE Airtricity Energy Services is an organisation that operates both in ROI and NI. We provide contracting services related to energy efficiency works in residential homes. These works include gas and oil heating upgrades, internal and external insulation, heat pumps, electrical services and full home retrofits. On average we complete in excess of 70 000 jobs per annum across the two jurisdictions.
Show more
We are seeking to award three new lots of supply contracts that will include supply, specification, delivery and stock management facilitation. Each contract will have a 2-year term with an option to extend up to a maximum of 3 additional years (of 1 + 1 + 1). These three lots will include the following:
Show more
1) supply of boilers and boiler install packs,
2) supply of boiler spares and parts,
3) supply, design and commissioning of heat pump systems.
Each lot may be awarded separately but will not preclude the same supplier for tendering for each lot. In addition, while this tender is focused on the ROI market for now, we will be looking to hear about your ability to provide supply services to both ROI and NI. Your availability to service the NI market or not will not preclude you from the award of the ROI contracts currently under tender.
Show more
Lot 1: Boilers and boiler install packs
SSE Airtricity Energy Services is seeking to award a contract for the provision of a range of domestic gas boilers and the associated install pack requirements suitable for the Irish market. Whilst price will always be a factor in our decision and must be competitive, some of the ancillary requirements are as important for the operational effectiveness of our business. We are a national energy services business covering all parts of Ireland. We have a requirement that any orders made within 24 hours can be delivered to site for the next morning by 8.30 a.m. at the latest.
Show more
Lot 2: Boiler spares and parts
We have a significant boiler service and repair element to our business, completing almost 20 000 service and repair jobs per annum. As such we have a requirement to be able to source and provide the main industry spares for the most popular domestic gas boilers in the market. We have a requirement that any orders made within 48 hours can be delivered or collected from a branch where possible.
Show more
Lot 3: Supply, design and commissioning of heat pump systems
We have a significant residential/commercial retrofit contract nationwide as an element to our business. As such we have a requirement to be able to source and provide a top tier design and supply heat-pump manufacturer for bot h Air-Air and Air-Water in the market. We are a national energy services business covering all parts of Ireland with gas. We have a requirement that any orders made within 48 hours can be delivered or collected from a branch where possible.
Show more

Complementary information
Review body
Name: SSE plc
Postal town: Dublin
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Source: OJS 2020/S 064-154045 (2020-03-27)