In summary, the Services comprise the supply, install and commission of a new Harbour Mobile Crane. As the existing Port Crane does not have the ability to unload due to increased ship sizes, a new Mobile Crane with increased capacity is required to service current/future product throughput. It is expected that the Mobile Crane will be commissioned by May 2019.
Deadline
The time limit for receipt of tenders was 2019-01-21.
The procurement was published on 2018-12-19.
Contract notice (2018-12-19) Object Scope of the procurement
Title: Harbour cranes
Reference number: GHC Crane Supply and Service RFT
Short description:
โIn summary, the Services comprise the supply, install and commission of a new Harbour Mobile Crane. As the existing Port Crane does not have the ability to...โ
Short description
In summary, the Services comprise the supply, install and commission of a new Harbour Mobile Crane. As the existing Port Crane does not have the ability to unload due to increased ship sizes, a new Mobile Crane with increased capacity is required to service current/future product throughput. It is expected that the Mobile Crane will be commissioned by May 2019.
Show more Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Services
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Harbour cranes๐ฆ
Additional CPV: Cranes๐ฆ Place of performance
NUTS region: West๐๏ธ
Procedure
Procedure type: Open procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender